Issued 2026-05-12 · issued yesterday · Permit BP-2025-03703 · New Building
Certified Professional Program - New Building - To construct a new 6-storey seniors community care (class B) facility classified as Group B3 major occupancy containing a total of 178 care beds including one level of parking on this existing site to replace the existing Care Home.
Principal entrance is located at 3rd storey.
This is a CP Process Permit, and the applicant is Jack Hui, P.Eng. CP
NOTES 1. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511) with amendments effective on July 1, 2025. 2. This project is being processed under SHORT program. 3. High Building measures apply. Building requires a 2-stage FAS.
STAGED CONSTRUCTION Stage 1 - Excavation & Shoring - Issued on May 12, 2026
Analyst briefWin likelihood: med
Lark Projects Ltd has a $83M seniors care facility permit (6 storeys, 178 beds) issued May 2026. This is institutional work but the permit just issued, signaling construction ramp-up. Heavy foundation and structural scope typical for care buildings with parking.
Inquire about foundation and structural trades availability for this major institutional seniors facility.
Contractor: Lark Projects Ltd · Applicant: Jack Hui DBA: Pontem Group
Issued 2026-05-12 · issued yesterday · Permit DB-2025-03277 · New Building
Low Density Housing - New Building - 1FD + SS
To construct a 2½ storey + crawl space single detached house with a secondary suite located in the first floor ($989,750.00).
1.\tCovenant registered at the Land Title Office under CB2296568 2.\tNo Strata Titling permitted 4.\tMechanical unit proposed – Exterior component located in REAR YARD, Interior component located in crawl space 5.\tBar sink located in partial storey. 6.\tSchedule B: (JASON BAL) P.Eng (604-657-8809) Structural 7.\tSchedule B: (JASON BAL) P.Eng (604-657-8809) Geotechnical 8.\tHPO: Residential Builder- (Puzzle Developments Ltd)
Note: This is a 2½-storey building pursuant to the Zoning and Development By-Law
Note: The entire building to be sprinklered to NFPA 13D
Note: As shown by an asterisk (*) on the building permit floor plans and/or elevations, opening protection is required where applicable in accordance with Articles 9.9.4.4., 9.9.4.5., and/or 9.9.4.6., and shall be provided in conformance with Sentence 9.9.4.3.(4) of the 2025 Vancouver Building By-law.
Address Information: BUILDING 1 2587 Upland Dr - Single Detached House (portion of 1st floor, 2nd and 3rd floor) 7293 Ashburn St - Secondary Suite (south east portion of 1st floor)
Address numbers assigned as per approved plans for Fire and Emergency response. The address numbers are to be posted to the building to be visible from the street and in accordance with the Building By-law prior to final inspection. NEW R1-1 BYLAW
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: med
Puzzle Developments Ltd pulled permit for $990k new two-storey detached with secondary suite in Vancouver. Issued May 2026, early-stage new build. Contractor-led project with structural engineer assigned. Strong fit for flooring and systems work.
Ask about flooring and finishing timeline for the main unit and secondary suite.
Issued 2026-05-12 · issued yesterday · Permit DB-2025-03337 · New Building
Low Density Housing - New Building - To construct a 2.5-storey single detached house ($888,800.00) with a detached accessory building (garage), at the rear providing 2 parking spaces, having vehicular access from the lane.
1. Part 5 design provided for unventilated horizontal assembly. 2. Part 3 VBBL design provided for a 4-storey building. 3.\tNo Strata Titling permitted 4.\tMechanical unit proposed – Exterior component located in rear yard 5.\tSchedule B: (Da Chuan (Danny) Yu) P.Eng (778.926.0525) Structural 6.\tSchedule B: (Da Chuan (Danny) Yu) P.Eng (778.926.0525) Architectural 7.\tSchedule B: (P.K.L. Fong) P.Eng (604.837.3205) Geotechnical 8.\tSchedule A: (Richard Kadulski) P.Eng (604.689.1841) 9.\tSchedule D: (Richard Kadulski) P.Eng (604.689.1841) 10.\tHPO: Residential Builder- Coastline Projects Ltd.
Address Information:
4355 Locarno CRESCENT
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: low
StructusDesign Group Ltd (applicant) with Coastline Projects Ltd building $889k two-storey detached in upscale Locarno neighbourhood. Issued May 2026. Design-forward project (Part 3/5 compliance noted) with established structural team. Larger contractor-managed.
Contact Coastline Projects directly—this GC-led project requires trade coordination through their pipeline.
Contractor: Coastline Projects Ltd · Applicant: StructusDesign Group Ltd DBA: StructusDesign Group LTD
Interior alterations to provide improvements for a new tenant on the 7th floor (#700) of this existing commercial building on site.
Scope of work: Selective demo includes reception, rooms, offices to create an open space. Construct new exterior windor offices, create elevator lobby, glazing sidelights on all offices/meeting rooms, flooring, paint, electrical and sprinkler work to suit.
TENANT: Invictus Accounting Group LLP
Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
Full-floor office reno for Invictus Accounting at 1199 W Hastings, $325k. Totalplan Inc. submitted May 12th. Scope includes selective demo, new offices, and mechanical/electrical to suit. Established contractor on high-end commercial interiors—solid lead with clear HVAC requirements.
Totalplan's projects need reliable mechanical partners; we've worked similar Hastings corridor builds.
Contractor: TotalPlan Inc · Applicant: Totalplan Admin DBA: Totalplan Inc.
hvacelectricalplumbingwindowsflooringpaintnew buildreno major
High Density Housing / Commercial - Addition / Alteration - Interior alterations to provide fire alarm and electrical improvements to this building on all floors, in this existing mixed-use commercial high-rise building on this site.
Scope of work: replacement of existing panel with new addressable fire alarm control and annunciator panel, Provide and install (15) new smoke detectors for future elevator recall, Provide and install (18) new speaker strobes, Remove (11) fire alarm node panels, Reconnect existing addressable devices, Verification of the fire alarm system in conformance with CAN/ULC S537
Notes: 1. New smoke detectors install are for future elevator recall on a separate application. 2. Permit reviewed and approved to VBBL #14343 (2025).
Analyst briefWin likelihood: low
Action Electric Ltd (applicant/likely contractor) pulled $276k permit for fire alarm and electrical upgrades across all floors in mixed-use high-rise. Scope: new addressable panel, smoke detectors, speaker strobes. This is a control system refresh—callableif you partner on large-building retrofit work.
Confirm whether Action Electric needs subcontractor support for speaker strobe installation or panel wiring.
Issued 2026-05-11 · issued 2 days ago · Permit DB-2026-00859 · Addition / Alteration
Field Review - Addition / Alteration - 196 W 20th Ave
Exterior and Interior alterations to provide residential improvements to this existing single detached house on this site.
Scope of work includes updates to living room. office, powder room, kitchen on the main floor; bathroom, bedrooms and closets on the upper floor; bedroom, bathroom, laundry room and home theater on the basement floor; new windows, and doors throughout.
Okay for field review as per J.Ly, March 13, 2026
This is a sprinklered building. Sprinkler Contractor: Preet Plumbing, Heating, and Sprinkler Ltd
Letter of Assurance: Schedule B (Struct) provided by Allester Engineering (2025) Ltd.- Scott Ash- Anderson, P.Eng ph#: 604-228-0518
This permit was reviewed under VBBL 2025.
Analyst briefWin likelihood: high
Blackfish Homes is executing $1.5M interior/exterior reno on a single-family home: flooring, windows, doors, kitchen, bathrooms across three levels. Homeowner-pulled (Carly Zurbuchen), small contractor, recent permit, scope aligns perfectly with major reno trade.
Call to discuss flooring selections and coordination across multi-floor renovation timeline.
Contractor: Blackfish Homes Ltd · Applicant: Carly Zurbuchen
Issued 2026-05-11 · issued 2 days ago · Permit DB-2025-02623 · New Building
Low Density Housing - New Building - To construct a 2 storey single detached house with a secondary suite located in the Basement ($890,000) with an open parking pad, providing 1 parking space, having vehicular access from the 20' lane.
1.\tCovenant registered at the Land Title Office under CB2223756 2.\tMechanical unit proposed – Exterior component located in courtyard, Interior component located in second floor laundry closet 3.\tBar sink located in basement recreation room 4.\tSchedule B: (Y. K. Sharma) P.Eng (778-863-7076) Structural & Geotechnical 5.\tHPO: Residential Builder – RPHS Dream Homes Ltd.
Note: The entire building to be sprinklered to NFPA 13D
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
Address Information: Building 1 #1-6582 Butler St - Principal Dwelling (north side basement, 1st-3rd floors) *3rd floor is deck #2-6582 Butler St - Secondary Suite (south side basement)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: med
Amardeep Dhillon (Space Smart Home Design) with RPHS Dream Homes building $890k two-storey detached + basement suite on Butler Street. Issued May 2026, early-stage. Flooring, landscape, and mechanical all noted—active multi-trade coordination needed.
Mention you coordinate flooring finishes between main level and basement suite to simplify owner decisions.
Contractor: RPHS Dream Homes · Applicant: Amardeep Dhillon DBA: space smart home design ltd.
Issued 2026-05-11 · issued 2 days ago · Permit DB-2025-02055 · New Building
Low Density Housing - New Building - To construct a 2.5 storey single detached house with a secondary suite located in the main floor ($800,000) with an open parking area, providing a total of 1 parking space, having vehicular access from the 20' lane.
1.\tCovenant registered at the Land Title Office under CB2610444 2.\tMechanical unit proposed – Exterior component located in courtyard, Interior component located in second floor closet 3.\tBar sink located in main floor rec room 4.\tSchedule B: (X.L.Chen) P.Eng (778-235-5447) Structural 5.\tSchedule B: (J.J.S.Hui) P.Eng (778-319-3403) Geotechnical 6.\tHPO: Residential Builder – C-Best Construction Ltd.
Note: The entire building to be sprinklered to NFPA 13D
Note: This is a 2.5 storey building pursuant to the Zoning and Development By-Law
Address Information: Building 1 #1-459 E 57th Av – Single Detached House (1st - 3rd floor, west portion of basement) #2-459 E 57th Av - Secondary Suite (east portion of basement)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: high
Homeowner Raj Singh pulled permit for $800k single-detach with secondary suite, recently issued. C-Best Construction is the contractor. Project includes mechanical and plumbing rough-ins. Early-stage work means trades scheduling now—solid opportunity to quote flooring and coordinate build sequencing.
We handle flooring spec and install for new single-family builds—when does your framing close?
Contractor: C-Best Construction Ltd · Applicant: Bhupinder (Raj) Singh DBA: Raj Home Design
Issued 2026-05-11 · issued 2 days ago · Permit DB-2025-00998 · New Building
Low Density Housing - New Building - To construct a 1 storey laneway house building ($500,500.00) with an attached garage, providing a total of 3 parking spaces, having vehicular access from the rear 20' Lane.
Refer to AL-2025-00106 for alternative solutions.
1.\tCovenant to be registered prior to sheathing inspection. 2.\tNo Strata Titling permitted 3.\tNo external mechanical unit proposed 4.\tEntire building to be sprinklered NFPA 13 5.\tSchedule A: (Peter Rose) P.Eng (604.736.7939) 6.\tSchedule B: (Peter Rose) P.Eng (604.736.7939) Architectural 7.\tSchedule B: (Tim Lam) P.Eng (604.255.7670) Structural 8.\tSchedule B: (Tim Lam) P.Eng (604.255.7670) Geotechnical 9.\tHPO: Residential Builder- Seven Homes Ltd. 10.\tHRV required for laneway house as of year 2022
Address Information:
Building 2 #3- 4770 Drummond Dr - Laneway House (1 storey)
Address and suite number assigned as per approved plans for Fire and Emergency response. The address number is to be posted to the building to be visible from the street and the suite number is to be posted at the suite entry in accordance with the Building By-law prior to final inspection.
Note: As a result of the addition of a laneway house, the main house / principal dwelling will be assigned a suite number and the site will be as follows: #1- 4770 Drummond Dr - Principal Dwelling
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: med
New laneway house construction ($500k) with Seven Homes as contractor; issued mid-May, sprinklered building, architect-led. Early-stage new build with established residential builder. Good opportunity for flooring and renovation-phase work once framing and mechanical rough-ins complete.
Contact Seven Homes to discuss flooring and interior finish scope for the new laneway house build.
Contractor: Seven Homes Ltd. · Applicant: David Pritchard DBA: Peter Rose Architecture
Issued 2026-05-11 · issued 2 days ago · Permit BP-2024-05152 · New Building
High Density Housing / Commercial - New Building - Building Permit for BP-2024-02016
To construct a 3-storey multiple dwelling building over one level of underground parking with storages, bike storages, and service rooms, having vehicular access from the rear lane.
This is a CP Process Permit and the applicant is Koosha Kheradmandria, P. Eng., CP.
Building to be sprinklered to NFPA 13.
*REVIEWED UNDER VBBL 2019
Refer to Site Permit BP-2024-02016 for all drawings and documents for this site.
Refer to BP-2024-05151 for Building 1 Refer to BP-2024-05152 for Building 2 Refer to BP-2024-05153 for Building 3
STAGED CONSTRUCTION Stage 3: Full Construction- (2026-05-11- S.Le) Refer to DPMA DP-2025-00786 Change of Structural Engineer of Record from Damoon Motamedi, Ph.D., P.Eng., from Raft Consulting Ltd., to Yeming Li, P.Eng., Struct.Eng., from Deer Lake Engineering & Associates Ltd. effective November 5th, 2025.
Analyst briefWin likelihood: med
Large new 3-storey multiple-dwelling project with underground parking pulled by Arvand Engineering (applicant, not contractor named). CP process permit signals institutional complexity. Value shows as $0 but scope is substantial; no contractor assigned yet.
Major residential new-build coming online—reach out to identify the GC and bid the electrical package.
Issued 2026-05-11 · issued 2 days ago · Permit BP-2024-05153 · New Building
High Density Housing / Commercial - New Building - Building Permit for BP-2024-02016
To construct a 3-storey multiple dwelling building over one level of underground parking with storages, bike storages, and service rooms, having vehicular access from the rear lane.
This is a CP Process Permit and the applicant is Koosha Kheradmandria, P. Eng., CP.
Building to be sprinklered to NFPA 13.
*REVIEWED UNDER VBBL 2019
Refer to Site Permit BP-2024-02016 for all drawings and documents for this site.
Refer to BP-2024-05151 for Building 1 Refer to BP-2024-05152 for Building 2 Refer to BP-2024-05153 for Building 3
STAGED CONSTRUCTION Stage 3: Full Construction- (2026-05-11- S.Le) Refer to DPMA DP-2025-00786 Change of Structural Engineer of Record from Damoon Motamedi, Ph.D., P.Eng., from Raft Consulting Ltd., to Yeming Li, P.Eng., Struct.Eng., from Deer Lake Engineering & Associates Ltd. effective November 5th, 2025.
Analyst briefWin likelihood: med
Duplicate of permit 14894 at adjacent address (792 vs. 788 W 39th). Same 3-storey multiple dwelling, same applicant Arvand Engineering, same project reference BP-2024-02016. Likely data error; treat as one project.
Same project as 14894—coordinate outreach to avoid duplicate contact.
Issued 2026-05-08 · issued 5 days ago · Permit BP-2024-01783 · New Building
Certified Professional Program - New Building - To construct a mixed-use building consisting of:
3-storey firehall: 1st storey - fire truck bays; office: community space 2nd storey - gym; mechanical room 3rd storey - dormitories; kitchen; outdoor amenity
28-storey tower: 1st storey - residential amenity room 2nd to 4th storeys - dwelling units 5th storey - child care facility (44 children) 6th to 27th storeys - dwelling units; indoor & outdoor amenities on L12 28th storey - indoor & outdoor amenities
all over 2 levels of underground parking accessed from Expo Blvd.
Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required. 3. The 3-storey fire hall portion has greater floor-to-floor heights, equivalent to 4 storeys of the residential tower. 4. The firehall portion and the entire underground structure have been designed using the Importance Factor applicable to post-disaster buildings.
REVISION I: Change of Owner (S.Yoo) ISSUED: Feb. 24, 2026
STAGE II: Foundation up to Grade (S.Yoo) ISSUED: May 8, 2026
STAGE III: Full Construction - In review
Analyst briefWin likelihood: med
Ventana Construction is building a massive $168M mixed-use project (28-storey tower plus 3-storey firehall) in Vancouver. This is a Certified Professional permit issued May 2026, meaning design and permitting are complete and site mobilization is imminent. Major foundation, structural, and MEP work ahead.
Ask about subcontractor roster for foundation and early-stage trades on this $168M mixed-use tower.
Contractor: Ventana Construction Corporation · Applicant: Jun Hyung Kim DBA: GHL Consultants, a part of J.S. Held
Issued 2026-05-08 · issued 5 days ago · Permit BP-2019-04569 · New Building
Certified Professional Program - New Building - To construct a 10-storey mixed-use high building and 6-storey mixed-use combustible midrise building over 2-levels of above ground parking consisting of 1st storey - social enterprise space and parkade 2nd storey - parkade 3rd to 4th storeys - withdrawal management and care centre 5th to 10th storeys - 97 social housing units
This application is being processed under the SHORT program and VBBL 2019.
STAGED CONSTRUCTION Stage 1: Excavation and Shoring - issued July 25, 2024
Stage 2: Foundation Up to and Including Level 1 - issued Sept. 23, 2025
Revision #1: Addition of Geotechnical Engineer for Temporary Geotechnical Discipline; Substitution of Shoring Drawings - issued May 2, 2025
Revision #2: As of August 21st, 2025, Darrell Li taking over the role of Certified Professional from Dean Skalski
Revision #3: As of December 5, 2025, Dean Skalski is the CP for this project.
Stage 3: Structure from Level 2 Floor Slab up to Level 4 Floor Slab (structural only) - issued May 8, 2026 Note: No separate sprinkler permit application has been submitted for this stage. One has been submitted for Stage 2 and another for Stage 4. No sprinkler work shall commence on Levels 3 and 4 until the Stage 4 BP has been issued.
Stage 4: Full Construction - In review
Analyst briefWin likelihood: low
Chandos Construction pulled a $95M mixed-use social housing project with staged excavation underway. This is institutional scale—detoxification centre with 97 units across 10 storeys. Major renovation scope fits your trade, but decision-makers are architects and the municipality, not the contractor.
Not recommended—institutional project with established GC and design team.
Contractor: Chandos Construction · Applicant: Dean Skalski DBA: Certified Professional
interior alterations to provide improvements for a new office tenant on the 17th floor (#1750) of this existing commercial building on this site.
Scope of work: Complete tenant fit out to shell space . Electrical, mechanical/plumbing, & sprinklers to suit.
See BP-2025-04052 for interior demo.
* In accordance with VBBL 2025
Letters of Assurance - - Schedule A and Architectural Schedule B by Harrison Chan, Architect, AIBC. Ph#416-961-4111. - Electrical Schedule B by John-Paul Violante, P.Eng. ph#905-507-0800. - Mechanical Schedule B by Robert Luft, P.Eng. ph#905-507-0800.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
WZMH Architects pulled this 17th-floor office tenant fit-out ($1.9M) with full MEP scope on May 8. No contractor named yet—early stage. This is an architect-led design-build opportunity before GC selection hardens.
Contact WZMH Architects directly to discuss HVAC design and coordination for this 17th-floor office shell.
Issued 2026-05-08 · issued 5 days ago · Permit DB-2025-04323 · New Building
Low Density Housing - New Building - To construct a 2 storey laneway house building ($646,455.00) with 1 open parking pad, providing a total of 1 parking spaces, having vehicular access from the 20' Lane.
Note: The entire building to be sprinklered to NFPA 13D
Note: This is a 2 storey building pursuant to the Zoning & Development By-law.
1.\tCovenant not required with existing house 2.\tNo Strata Titling permitted 3.\tNo A/C Unit proposed 4.\tHeat pump proposed – Exterior component located east of laneway house 5.\tSchedule B: (A. Ahmed) P.Eng (604.579.0110) Structural 6.\tSchedule B: (P. K. L. Fong) P.Eng (604.837.3205) Geotechnical 7.\tHPO: Residential Builder- Smallworks Studios and Laneway Housing Inc.
NOTE: To achieve the required FSR. A floor space exclusion of 2% has been applied to this application as per section 11.24.18 of the district schedule, to accommodate improved building performance.
Address Information:
BUILDING 2 #3- 6125 Sherbrooke St - Laneway House (1st and 2nd Floor)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
Note: As a result of the addition of a laneway house, the main house / principal dwelling will be assigned a suite number and the site will be as follows: #1- 6125 Sherbrooke St - Principal Dwelling
NEW R1-1 BYLAW This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.
Analyst briefWin likelihood: high
Homeowner-applicant (Jeremy Keyzer) pulled permit for 2-storey laneway house ($646k) with heat pump specified. Smallworks Studio is contractor. Issued May 8, residential new-build scope is direct HVAC work.
Reach out about supplying and installing the heat pump system for this new laneway house.
Contractor: Smallworks Studio and Laneway Housing Inc · Applicant: Jeremy Keyzer
Issued 2026-05-08 · issued 5 days ago · Permit BP-2026-01417 · Addition / Alteration
Field Review - Addition / Alteration - #D001 - 701 W Georgia Street
Interior alterations to provide tenant improvements to this existing retail space for a new retail tenant on the lower level (#D001) of this existing Pacific Center Mall building.
Okay for Field Review as per I.Celic April 29, 2026
Letters of Assurance: Schedule B - Arch & Schedule A: Parisa Seyed-Hoseini (236)601-9705 Schedule B - Elec: David Joo (778)869-2477 Schedule B - Mech & Plum: James Y.P.Lee (778)231-5278 Schedule B - Struc: Shi Li Qing (778)655-9518
Analyst briefWin likelihood: low
Retail tenant fit-out ($500k) in Pacific Center Mall; field review approved late April. Architect-led project with mechanical and electrical consultants named. Institutional commercial property with multiple professional stakeholders suggests slower decision-making and limited scope for major renovation trades.
Reach out to Cutler Architecture to confirm flooring and interior finishes are not handled in-house by mall management.
Issued 2026-05-08 · issued 5 days ago · Permit DB-2025-05232 · New Building
Low Density Housing - New Building - To construct a 2 storey two-family dwelling ($453,300) with an attached garage, having vehicular access from the lane.
Note: The entire building, including the attached garage, is to be sprinklered to 2 x NFPA 13D
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
1.\tMechanical unit proposed – Exterior component located in the rear yard 2.\tSchedule B: (D.L. JUNG) P.Eng (604.762.1054) Structural 3.\tSchedule B: (J.M.STOREY) P.Eng (778.867.0439) Geotechnical 4.\tHPO: Residential Builder- Rvilla Homes Ltd
Address Information:
WEST UNIT #1-964 W 15th Av – One Dwelling Unit (1st & 2nd floor)
EAST UNIT #2-964 W 15th Av – One Dwelling Unit (1st & 2nd floor)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Analyst briefWin likelihood: high
Homeowner Gary Reandy pulled $454k duplex permit, issued May 8, with Rvilla Homes. Two-storey, attached garage, full sprinkler system. Fresh permit stage—flooring selections and scheduling likely happening now.
Two-unit duplex flooring—when does your framework close and are the units finished differently?
Contractor: Rvilla Homes Ltd · Applicant: Gary Reandy
Issued 2026-05-07 · issued 6 days ago · Permit BP-2025-02725 · Addition / Alteration
Low Density Housing - Addition / Alteration - Exterior and interiors alterations throughout this existing Heritage B Single Detached House with Secondary Suite on this inside with lane site. Scope of work includes raising the house to provide a full height basement, new roof at the rear, new insulation and cladding and a new rear deck.
Building to be sprinklered to NFPA 13 D standards.
Related to DP-2024-00517
Schedule B, Structural - Carlos Chiu, P.Eng, 604-737-9830.
'- REUP submitted by Peter Cho, City Green Solutions, 604-505-7837. Scope of work to include energy upgrade in accordance with Article 11.2.1.4 of the 2019 Vancouver Building By-law and as per the Energy Efficiency Upgrade Details noted in the Energuide Report. *Selected upgrades: fully insulate basement, exterior insulation min 1" thick, electrical panel upgrade. - Interconnected smoke alarms to be installed on each storey including basements, in each sleeping room and in a location between the sleeping room and the remainder of the storey and if the sleeping room is served by a hallway, the smoke alarm to be located in the hallway. Installed by permanent connections to an electrical circuit in conformance with 9.10.19. Provided with battery backup and manual silencing devices which will silence the alarm in conformance with 9.10.19.6. - Carbon Monoxide detectors to be provided in accordance with 9.32.4.2. - No strata titling will be permitted. - Dedicated 3' wide firefighter access path with overhead clearance of 2m to be maintained at all times. - An annual Vancouver Business Licence must be obtained prior to the rental of this approved one family dwelling and/or secondary suite on this site.
Analyst briefWin likelihood: high
Heritage house foundation raising and full exterior/interior reno ($600k), issued May 7. Homeowner-pulled permit (Topal and Sons Renovations as applicant, no contractor named yet). Early-stage, good entry point.
Mention experience with heritage basement-raising projects and coordinating electrical in foundation work.
Applicant: Heather Clark DBA: Topal and Sons Renovations
roofingelectricaldrywalllandscapenew buildreno major
Issued 2026-05-07 · issued 6 days ago · Permit DB-2026-00735 · New Building
Low Density Housing - New Building - To construct a 2 storey laneway house building ($500,000) with a carport, providing a total of 3 parking spaces, having vehicular access from the 20' Lane.
Note: The entire building to be sprinklered to NFPA 13D
Note: This is a 2 storey building pursuant to the Zoning & Development By-law.
1.\tMechanical unit proposed – Interior component located in the mechanical room 2.\tSchedule B: (K.J.MA) P.Eng (778.877.9016) Structural 3.\tSchedule B: (G.Z.ZHOU) P.Eng (604.838.2586) Geotechnical 4.\tHPO: Residential Builder- Kentwood Homes Ltd
NOTE: To achieve the required FSR. A floor space exclusion of 2% has been applied to this application as per section 10.15.1 of the Zoning-Bylaw, to accommodate improved building performance.
Address Information:
Building 2 #3-4420 Puget Dr - Laneway House (2.0 storeys)
Note: As a result of the addition of a laneway house, the main house / principal dwelling will be assigned a suite number and the site will be as follows: #1-4420 Puget Dr - Principal Dwelling #3-4420 Puget Dr - Laneway House
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Analyst briefWin likelihood: med
New two-storey laneway house ($500k) with Kentwood Homes as contractor; issued early May, sprinklered to NFPA 13D. Early-stage new build with established residential builder. Solid opportunity for flooring and interior finishing work once structural and mechanical phases advance.
Contact Kentwood Homes to discuss flooring and finishes timeline for the new laneway house construction.
Contractor: Kentwood Homes Ltd · Applicant: Mike Chu DBA: Westpoint Design & Development Ltd.
Interior alterations to provide improvment for a new office tenant on the 8th floor (#850) of this existing commercial building on this site.
Scope of work: demo to shell, remove and replace entrance door. New partitions, doors/frames, millwork, finishes. Electrical, plumbing/mechanical, sprinklers to suit.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
Single-floor office fit-out on the 8th floor at 999 W Hastings, $350k value. Applicant Jason Ludwig (Fusion Projects) pulled permit May 7th. HVAC scope is shell-to-finish mechanical, plumbing, and electrical for new tenant space—straightforward scope for an experienced mechanical crew.
We've completed similar office shells on Hastings; ready to quote your mechanical scope?
Contractor: Fusion Project Management Ltd · Applicant: Jason Ludwig DBA: Fusion Projects
hvacelectricalplumbingframingflooringnew buildreno major
Issued 2026-05-07 · issued 6 days ago · Permit DB-2025-04732 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - Exterior and Interior alterations to provide tenant improvements to this existing community centre building on this site. Interior alterations limited to reconfiguration of the cooking facilities in the existing kitchen space, updated kitchen equipment, new partition wall. Exterior alterations limited to new RTU for installation of new kitchen exhaust fan.
Notes: 1. A special sprinkler inspection may be required if removing, relocating, or deleting any sprinkler heads due to the scope of work. 2. Permit reviewed and approved to VBBL #14343 (2025).
Analyst briefWin likelihood: high
Community centre kitchen renovation ($100k) with architect applicant. New RTU and kitchen exhaust fan specifically called out. Interior kitchen equipment updates align with HVAC scope. Issued May 7, recently pulled—kitchen equipment coordination is key.
Contact to coordinate new kitchen exhaust and RTU installation with updated equipment layout.
Applicant: Alireza Danesh DBA: Danesh Architect Inc.
Issued 2026-05-06 · issued 7 days ago · Permit BP-2026-01198 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to renovate the electrical room on the parking level of this existing hotel building on this site. Scope of work includes installation of new electrical equipment.
Ok for field review per S. Voskakis, April 16, 2026
Schedule A and B Arch provided by Eizaburo Kibayashi, Architect, 778-861-9201, eiza@cloudscape.info Schedule B Struct provided by Brian Seo, Engineer, 778-322-6541, bseo@arcen.ca Schedule B Mech provided by Raymond Cho, Engineer, 778-956-8555, Raymond.Cho@ChorusConsulting.Co Schedule B Elect provided by Jeff Chen, ENgineer, 778-994-8518, jeff.chen@orijinal.ca
Analyst briefWin likelihood: high
Hotel parking-level electrical room renovation ($1.3M) with new equipment install, cleared for field review April 16. RESA Canada contractor, architect and engineers named. Focused electrical scope in occupied building.
Confirm you handle live-building electrical work and can coordinate after-hours installation windows.
Issued 2026-05-06 · issued 7 days ago · Permit DB-2026-00517 · New Building
Low Density Housing - New Building - 2FD + 2LO
To construct a 2 storey + basement duplex + (2) lock-off units located in the Basement ($1,100,000.00) with a detached accessory building (garage) and open parking at the rear providing 3 parking spaces, having vehicular access from the lane.
1.\tMechanical unit proposed – Exterior component located in West Yard; Interior component located in Mechanical room 2.\tCovenant to be registered prior to sheathing inspection. 3.\tSchedule B: (Christopher Man) P.Eng (604-874-3237) Structural 4.\tSchedule B: (Jianzhong Jin) P.Eng (604-362-7021) Geotechnical 5.\tHPO: Residential Builder- (Vandwell Developments Inc)
Note: This is a 2-storey building pursuant to the Zoning and Development By-Law
Note: The entire building to be sprinklered to NFPA 13D
Address Information:
North Unit #1-408 E 20th Av – One Dwelling Unit (north portion of 1st - 2nd floor + roof deck) (primary) #2-408 E 20th Av - Lock Off Unit (basement)
South Unit 3638 Prince Edward St – One Dwelling Unit (south portion of 1st - 2nd floor + roof deck) 410 E 20th Av - Lock Off Unit (basement)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address numbers are to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
NEW R1-1 BYLAW
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Analyst briefWin likelihood: high
Duplex plus two basement lockoff units ($1.1M) issued May 6, pulled by architect Carman Kwan for Vandwell Developments. Roofing, flooring, and landscape all in scope. Smaller, experienced developer suggests straightforward execution. Basement work adds complexity but is callable now.
Duplex with basement suites needs coordinated roofing and flooring—we've managed Vandwell lockoff finishes.
Issued 2026-05-06 · issued 7 days ago · Permit DB-2025-04224 · New Building
Low Density Housing - New Building - To construct a Net Zero 2 storey duplex with (2) secondary suites located in the Basement ($800,000) with a detached accessory building (garage) at the rear providing 2 parking spaces, having vehicular access from the lane.
Note: The entire building to be sprinklered to 2 x NFPA 13D
1.\tCovenant registered at the Land Title Office under CB2455839 2.\tMechanical unit proposed – Exterior components located next to front sunken patio and rear deck, Interior components located in second floor hallway closets 3.\tSchedule B: (C.Shen) P.Eng (604-771-0116) Structural & Geotechnical 4.\tHPO: Residential Builder – CMGT Construction Group Ltd.
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
Address Information: NORTH UNIT #1- 2549 E 6th Av - Single Detached House (1st & 2nd floor) #2- 2549 E 6th Av - Secondary Suite (basement)
SOUTH UNIT #1- 2551 E 6th Av - Single Detached House (1st & 2nd floor) #2- 2551 E 6th Av - Secondary Suite (basement)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address numbers are to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.**
Analyst briefWin likelihood: med
Net Zero duplex with two basement suites, $800k value, issued May 6. Khang Nguyen (design studio applicant) with CMGT Construction. Sprinklered throughout. Trades listed include flooring and landscape. Mid-to-late planning phase suggests material selections underway.
Net Zero duplexes need precision flooring—sustainable materials that meet thermal specs?
Contractor: CMGT Construction Group Ltd · Applicant: Khang Nguyen DBA: Architrix Design Studio
Issued 2026-05-06 · issued 7 days ago · Permit DB-2026-00954 · New Building
Low Density Housing - New Building - To construct a 2 storey two-family dwelling ($700,000) with a detached accessory building (garage) providing 2 parking spaces, having vehicular access from the 16’ lane.
Note: The entire building to be sprinklered to 2 x NFPA 13D
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
1. Mechanical unit proposed (external components in front and rear yard, internal components in main floor) 2. Schedule B: A. S. Rathod, P.Eng (778-885-0551) Geotechnical & Structural 3. HPO: Residential Builder- (Sphere Builders Group Inc. #55946)
Address Information:
Front Unit -\t\t\t #1-2236 Kitchener St- Dwelling Unit (north side 1st-3rd floors), \t\t\t \t\t\t Back Unit -\t\t\t #2-2236 Kitchener St - Dwelling Unit (south side 1st-3rd floors).
Address number assigned as per approved plans for Fire and Emergency response. The address number is to be posted to the building and to be visible from the street in accordance with the Building By-law prior to final inspection.
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Analyst briefWin likelihood: high
Two-family dwelling, $700k, homeowner-pulled by Satnam Shergill with Sphere Builders. Sprinklered duplex just issued. Flooring and new-build trades in scope. Standard timeline suggests material vendors being locked in now.
Duplex flooring for two units—coordinating finishes between units and timeline with your framer?
Contractor: Sphere Builders Group Inc · Applicant: Satnam Shergill
Issued 2026-05-06 · issued 7 days ago · Permit DB-2025-02829 · New Building
Low Density Housing - New Building - To construct a 2 storey single detached house with a secondary suite located in the Basement ($600,000), with carport in the laneway house providing 2 parking spaces, having vehicular access from the 20' Lane.
Note: The entire building to be sprinklered to NFPA 13D
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
Note: As shown by an asterisk (*) on the building permit floor plans and/or elevations, exit protection is required to be provided in accordance with Articles 9.9.4.4., 9.9.4.6., and/or 9.37.2.8. of the 2019 VBBL.
1.\tCovenant registered at the Land Title Office under CB2283932 2.\tHeat pump proposed – Exterior component located in court yard, Interior component located in main floor mech room 3.\tHRV proposed – Located in second floor closet 4.\tSchedule B: (J.J.S. Hui) P.Eng (778.319.3403) Structural & Geotechnical 5.\tHPO: Residential Builder- Go On Holdings Ltd.
Address Information:
Building 1 #1-4048 W 18th Av - Single Detached House (1st & 2nd floor) #2-4048 W 18th Av - Secondary Suite (Basement)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: high
Homeowner QI LI is building a new 2-storey house with basement suite in Vancouver. Contractor GO ON HOLDINGS is managing the $600k project, recently issued. HVAC scope includes full new-build mechanical for both units plus sprinkler integration—solid opportunity for design and installation.
We specialize in dual-zone HVAC for basement suites; let's coordinate install timing with your framing crew.
Contractor: GO ON HOLDINGS LTD. · Applicant: QI LI DBA: LQ Design GROUP Ltd
Issued 2026-05-06 · issued 7 days ago · Permit DB-2025-03534 · Addition / Alteration
Low Density Housing - Addition / Alteration - Exterior and interior alterations to add a new side bumpout to the main floor, enclose a portion of the rear and add a new rear covered porch to this existing two storey one family dwelling on this inside with lane site.
Structural/Geotechnical Schedule B - Henry S.N Hsu (604)-322-7158
Analyst briefWin likelihood: high
Single-family home addition with side bumpout and rear porch; $600k, issued mid-May with Capilano Builders as contractor. Designer-led project at early stage with structural engineer engaged. Strong fit for major renovation scope with clear scope boundaries and established builder relationship.
Call Capilano Builders to discuss flooring and interior finish coordination for the new bumpout and porch areas.
Issued 2026-05-06 · issued 7 days ago · Permit DB-2025-02830 · New Building
Low Density Housing - New Building - To construct a 2 storey laneway house building ($231,500) with an attached carport providing a total of 2 parking spaces, having vehicular access from the 20' Lane.
Note: The entire building, INCLUDING THE ATTACHED CARPORTS, to be sprinklered to NFPA 13D (BULLETIN 2024-002-BU)
Note: This is a 2 storey building pursuant to the Zoning & Development By-law.
1.\tCovenant registered at the Land Title Office under CB2283932 2.\tNo Strata Titling permitted 3.\tNo Heat Pump proposed 4.\tHRV proposed – located in main floor entry 5.\tSchedule B: (J.J.S. Hui) P.Eng (778.319.3403) Structural & Geotechnical 6.\tHPO: Residential Builder- Go On Holdings Ltd.
NOTE: To achieve the required FSR. A floor space exclusion of 2% has been applied to this application as per section 10.15.1 of the Zoning-Bylaw, to accommodate improved building performance.
Address Information:
Building 2 #3-4048 W 18th Av - Laneway House (2.0 storey)
Address and suite number assigned as per approved plans for Fire and Emergency response. The address number is to be posted to the building to be visible from the street and the suite number is to be posted at the suite entry in accordance with the Building By-law prior to final inspection.
NOTE: Information regarding the principal building on the survey and site plan is for reference only. Any discrepancy between information regarding the principal building on the survey and/or site plan and approved permit drawings for the principal building are neither approved nor authorized under this laneway house permit.
Note: See DB-2025-02829 for Bldg 1 on site (principal bldg) addressed #1-4048 W 18th Av
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: high
Homeowner-pulled laneway house new construction ($232k) with GO ON HOLDINGS as contractor. Project issued May 2026, full scope includes HVAC for 2-storey residential build with sprinkler integration. Early-stage permit makes this callable for equipment and system planning.
Call to discuss HVAC design for new laneway house with integrated sprinkler coordination and NFPA 13D compliance.
Contractor: GO ON HOLDINGS LTD. · Applicant: QI LI DBA: LQ Design GROUP Ltd
Issued 2026-05-05 · issued 8 days ago · Permit BP-2018-04675 · New Building
Certified Professional Program - New Building - Parcel C of Phase 1 of the Pearson Dogwood redevelopment.
To construct a 29 storey mixed-use building with 9-storey podium consisting of:
Level 1 to 5 - Retail units, Health Care Office (Community Health Centre) incl. a Therapy pool at L2, Residential amenity ( leisure pool, GYM) Level 3 - Child Daycare Facility
Level 6 to 29 -30 Pearson Supportive Housing units (Community Care Facility Class A) and 217 residential units;
all over 4 levels of underground parking.
NOTE: This building is designed to VBBL 2014. The building is provided with single stage FA system. No modifications to the FA system are proposed.
NOTE: OCCUPANT LOAD AT LEVEL 4 IS RESTRICTED BASED ON OCCUPANT LOAD SIGNS.
STAGED CONSTRUCTION: 27-Sep-2019 - Stage I (excavation and shoring) issued. 05-May-2026 - Stage II (struct to grade) issued.
24-Oct-2025 - Revision # 1 issued. Effective Oct 3, 2025 David Ho, P. Eng., C.P. assumed responsibilities as a C.P. on this project.
28-Jan-2026 - Revision#2 issued. Changes to E &S drawings to reflect reduced number of U/G parking levels from 5 to 4 levels. Project description updated to reflect changes accepted under the DPMA DP-2025-00194. - Increase in the total number of residential units from 148 to 217 units - Increase in the number of supportive housing units from 16 to 30
Analyst briefWin likelihood: med
Onni Contracting is developing the $72.8M Pearson Dogwood Phase 1 (29-storey mixed-use with retail, health clinic, childcare, supportive housing). Permit issued May 2026. Pool and community amenities add specialized trade opportunities beyond standard residential.
Highlight pool construction and aquatic facility experience for this mixed-use redevelopment.
Contractor: Onni Contracting Ltd · Applicant: David Ho
Issued 2026-05-05 · issued 8 days ago · Permit BP-2025-02843 · New Building
High Density Housing / Commercial - New Building - *******ENTIRE BUILDING TO BE SPRINKERED TO NFPA 13R REQUIREMENT & PART 5 BUILDING********* To construct a three-storey townhouse development containing six dwelling units and an accessory building with electrical and mechanical room at the rear, with 3 surface parking spaces at the rear having vehicular access from the lane.
******THIS PERMIT HAS BEEN REVIEWED & ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 AND AMENDMENT EFFECTIVE FEBRUARY 27, 2025 ********
Building Review Branch Note: 1.\tSunken patio grade may be excluded from height calculation as per M. Vitkorvic. Should the sunken patio size change, building height is to be recalculated. 2.\tRelated to AL-2025-00200 - Single Shared Means of Egress 3.\tThis lot is to be stratified. 4.\tEntire building to be sprinklered to NFPA 13R requirement. 5.\tAll new windows, doors, and skylights shall conform to AAMA/WDMA/CSA101/I.S.2/A440, NAFS. 6.\tAll dwelling units have separate exterior entrances.
Analyst briefWin likelihood: med
New six-unit townhouse development ($1.5M) with full sprinkler and MEP scope, issued May 5. Contractor is numbered company; applicant is architect. Early-stage new construction with electrical as primary trade component.
Offer to coordinate electrical rough-in schedule with framing and mechanical trades on timeline.
Contractor: 1287049 B.C. LTD. · Applicant: Matthew Cheng DBA: Matthew Cheng Architect Inc.
Issued 2026-05-05 · issued 8 days ago · Permit DB-2026-00029 · New Building
Low Density Housing - New Building - 1FD + SS - NZ
To construct a 2 ½ storey (NetZero) single detached house with a secondary suite located in the first floor ($1,300,000.00).
1.\tCovenant registered at the Land Title Office under CB2728717 2.\tNo Strata Titling permitted 3.\tMechanical unit proposed – Exterior component located in west yard, Interior component located in main floor and second floor. 4.\tSchedule B: (YONGKANG DENG) P.Eng (604 505 6816) Structural 5.\tSchedule B: (YONGKANG DENG) P.Eng (604 505 6816) Geotechnical 6.\tHPO: Residential Builder- (TD Mai Development Inc)
• Note: This is a 2½ -storey building pursuant to the Zoning and Development By-Law
• Note: The entire building to be sprinklered to NFPA 13D
• Note: As shown by an asterisk (*) on the building permit floor plans and/or elevations, opening protection is required where applicable in accordance with Articles 9.9.4.4., 9.9.4.5., and/or 9.9.4.6., and shall be provided in conformance with Sentence 9.9.4.3.(4) of the 2025 Vancouver Building By-law.
• Note: per Section 10.33.1(e), the Net Zero building has applied a floor area exclusion of 19% of permitted floor area.
•\tNote: per Section 10.33.1(a), the Net Zero building has applied an increase in permitted building height of 0.6 m.
Addressing:
Building 1 #1-1659 E 60th Av - Principal Dwelling (south east and north side of basement level, 1st-2nd levels) #2-1659 E 60th Av - Secondary Suite (south west portion of basement level)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
NEW R1-1 BYLAW
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Analyst briefWin likelihood: high
Homeowner-pulled NetZero single-family build with secondary suite ($1.3M) issued May 5. Small builder (TD Mai Development) means you're early in the pipeline. NetZero mechanical adds complexity—HVAC, electrical, and flooring trades will all be needed. High-touch opportunity.
We specialize in NetZero flooring systems; let's discuss timeline and material selections.
Contractor: TD Mai Development Inc · Applicant: Merry Gao DBA: Yan Building Design Studio Ltd.
Issued 2026-05-05 · issued 8 days ago · Permit BP-2025-04105 · New Building
Low Density Housing - New Building - To construct a Multiple Dwelling 'Multiplex' with a 2-unit front building and a 2-unit rear building with five surface parking spots having vehicular access from the lane.
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
Note: The entire building to be sprinklered to NFPA 13D
Address Information:
Building 1 (Front) (south) #1- 2277 E 19th Av - One Dwelling Unit (west side 1st-3rd floors) #2- 2277 E 19th Av- One Dwelling Unit (east side 1st-3rd floors)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: med
Four-unit multiplex ($1.1M) issued May 5 under established builder Positano Properties. Architect-led design (Architectural Collective) suggests professional coordination already underway. Early-stage permit means trades still ramping; flooring scope is significant across four units.
Four-unit flooring—we've coordinated spec'd materials across similar Positano multiplex projects.
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
Note: The entire building to be sprinklered to NFPA 13D
Address information:
Building 2 (Rear) (north) #1- 2279 E 19th Av - One Dwelling Unit (west side 1st-2nd floors) #2- 2279 E 19th Av - One Dwelling Unit (east side 1st-2nd floors)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: med
Four-unit multiplex ($1.1M) issued May 5, same architect and builder as permit 14978 (near-identical project). Positano Properties is the HPO. Flooring scope mirrors the parallel build. Early permit means scheduling overlap with concurrent projects is possible.
Repeat builder, repeat architect—we coordinated flooring on your parallel E 19th site.
Issued 2026-05-05 · issued 8 days ago · Permit DB-2025-04831 · New Building
Low Density Housing - New Building - 2FD
To construct a 2 ½ storey ($1,035,000.00) with a detached accessory building (garage) and 1 open parking at the rear providing 3 parking spaces, having vehicular access from the lane.
1.\tMechanical unit proposed – Exterior component located in rear yard; Interior component located in Mechanical closet. 2.\tSchedule B: (ZHI YI YOU) P.Eng (778 302 2155) Structural 3.\tSchedule B: (ZHI YI YOU) P.Eng (778 302 2155) Geotechnical 4.\tHPO: Residential Builder- (Comfort Development Ltd)
•\tNote: The entire building to be sprinklered to NFPA 13R
Address Information: LOWER UNIT #1-7949 Hudson St – One Dwelling Unit (1st-2nd floor)
UPPER UNIT #2-7949 Hudson St – One Dwelling Unit (2nd-3rd floor)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
NEW R1-1 BYLAW
*This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.,
Analyst briefWin likelihood: high
Duplex ($1.0M) issued May 5, pulled by homeowner Eva Wang, built by small contractor Comfort Development. Early-stage permit with straightforward scope. Smaller operator means fewer gatekeepers and faster decision-making. Flooring and new-build trades aligned with your service.
Small builder duplex—we handle flooring scheduling to keep your timeline tight.
Contractor: Comfort Development Ltd · Applicant: Eva Wang
Issued 2026-05-05 · issued 8 days ago · Permit DB-2026-00031 · New Building
Low Density Housing - New Building - 2.0 LWH - NZ
To construct a 2-storey (NetZero) laneway house building ($500,000.00) with a carport providing a total of 2 parking spaces, having vehicular access from the 20' (location) Lane.
1.\tCovenant registered at the Land Title Office under CB2728717 2.\tNo Strata Titling permitted 3.\tMechanical unit proposed – Exterior component located in west yard, Interior component located in main floor. 4.\tSchedule B: (YONGKANG DENG) P.Eng (604 505 6816) Structural 5.\tSchedule B: (YONGKANG DENG) P.Eng (604 505 6816) Geotechnical 6.\tHPO: Residential Builder- (TD Mai Development Inc)
• Note: This is a 2 -storey building pursuant to the Zoning and Development By-Law
• Note: The entire building to be sprinklered to NFPA 13D
• Note: per Section 10.33.1(e), the Net Zero building has applied a floor area exclusion of 19% of permitted floor area.
NEW R1-1 BYLAW
Addressing: Building 2 #3-1659 E 60th Av - Laneway House (2.0 storeys)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Analyst briefWin likelihood: med
Net Zero laneway house, $500k, designer-applicant Merry Gao with TD Mai Development. Recently issued (May 5). Compact footprint and sustainability focus. Early planning phase; limited trades in scope but flooring still critical spec item.
Laneway houses need efficient flooring layouts—interested in water-based or low-VOC finishes for Net Zero?
Contractor: TD Mai Development Inc · Applicant: Merry Gao DBA: Yan Building Design Studio Ltd.
Issued 2026-05-05 · issued 8 days ago · Permit DB-2026-00272 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - Exterior and interior alterations to provide tenant improvements to this existing Restaurant Class-1 (Group A-2) for a new tenant on the ground floor of this existing Vancouver Heritage Register commercial building on this site.
Exterior alterations include adding two louvers for kitchen exhaust system, one intake louver in the storefront for intake, one exhaust louver facing the rear.
Notes: - Reviewed under the 2025 VBBL. - Class 1 cooking operations (Grease-Laden Vapours). - Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). - Schedule A, B (Architectural, Electrical, Mech/Plumb, Fire Suppression) provided. - Total proposed occupant load is 34. Two washrooms, including one universal washroom are existing. - Signage requires a separate permit.
Analyst briefWin likelihood: med
Cloudscape Architecture pulled permit for ground-floor restaurant tenant improvements in heritage building. Willow Spring Construction handling $500k alteration including kitchen exhaust/intake louvers. Electrical work is subscope of larger reno—good fit for coordinating MEP upgrades in phased commercial tenant fit-out.
Call to confirm electrical scope for new kitchen exhaust system installation and tenant power upgrades.
Contractor: Willow Spring Construction BC Ltd. · Applicant: Eiza Kibayashi DBA: Cloudscape Architecture Inc.
electricalplumbingwindowsflooringnew buildreno major
Issued 2026-05-04 · issued 9 days ago · Permit BP-2025-01235 · New Building
Certified Professional Program - New Building - To construct a 7-storey building of care occupancy (167 dwelling units) consisting of: 1st storey - dwelling units; common areas for residents including dining 2nd to 4th storeys - suites of care occupancy; common areas 5th to 6th storeys - dwelling units 7th storey (rooftop) - indoor & outdoor amenities
all over 1 level of underground parking accessed from the side lane.
Notes: 1. This permit has been reviewed under the provisions of VBBL 2019. 2. A radio antenna system is required.
STAGE II: Foundation up to Grade (S.Yoo) ISSUED: May 4, 2026
STAGE III: Full Construction - In review
Analyst briefWin likelihood: med
MARCON PROJECT is constructing a $51.3M, 7-storey care occupancy building (167 units) with rooftop amenities. Issued May 2026. Roofing and MEP systems on a care facility typically have specific code requirements and tight scheduling.
Offer specialized roofing and rooftop amenity expertise for care-occupancy building codes.
Issued 2026-05-04 · issued 9 days ago · Permit DB-2026-00285 · New Building
Low Density Housing - New Building - *** Net Zero***
To construct a 2 storey duplex ($900,000.00) with a detached accessory building (garage) providing 2 parking spaces, having vehicular access from the lane.
Note: The entire building, to be sprinklered to 2 x NFPA 13D
1.\tMechanical unit proposed – Exterior component located in front yard 2.\tSchedule B: (WEIZHENG SU) P.Eng (604.367.6645) Structural 3.\tSchedule B: (WEIZHENG SU) P.Eng (604.367.6645) Geotechnical 4.\tSchedule B: (WEIZHENG SU) P.Eng (604.367.6645) Glass Guard 5.\tSchedule B: (Rajpreet Grewal) P.Eng (778.840.6582) Solar Panel 6.\tHPO: Residential Builder- BML Management Inc.
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
Address Information: Front Unit -\t\t\t #1-3580 W 17th Av - Dwelling Unit (north side 1st-3rd levels), \t\t\t \t\t\t Back Unit -\t\t\t #2-3580 W 17th Av - Dwelling Unit (south side 1st-3rd levels).\t
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
NEW R1-1 BYLAW
*This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.,
Analyst briefWin likelihood: low
Congli Xie (applicant) with BML Management Inc. contractor building $900k duplex marked Net Zero on W 17th Avenue. Issued May 2026. Sprinklered, structured engineering in place. Solar-ready build but larger GC involved—less direct owner access.
This is a managed GC project; contact BML directly if solar or EV-charging infrastructure is in scope.
Contractor: BML MANAGEMENT INC. · Applicant: Congli Xie
Issued 2026-05-04 · issued 9 days ago · Permit BP-2026-00880 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to provide first tenant improvements for a new Health Care Office tenant in this unit #240 on the 2nd floor of this existing mixed-use building on this site.
Sch A & B (Arch): Danny Wong, 604-773-2068, Architelier architecture Sch B (Mech + Plumb): Satwik Shetty, 778-360-1251, Aquavolt Engineering Sch B (Elec): Abdul El-Haddad, 778-360-1251, Aquavolt Engineering
Analyst briefWin likelihood: low
$350k health-care office tenant improvements in mixed-use building. Architect and engineers (mech, plumb, elec) assigned; applicant is Medcorp Construction Inc. Field-review stage. Limited entry unless subcontract roles remain open.
Check with Medcorp if specialized reno or MEP trades are still needed for this health-office fit-out.
Applicant: Gary Chohan DBA: Medcorp Construction Inc
Issued 2026-05-01 · issued 12 days ago · Permit DB-2026-00632 · New Building
Low Density Housing - New Building - 1FD + SS + DG
To construct a 2 ½ storey + basement single detached house with a secondary suite located in the Basement ($953,482.50) with a detached accessory building (garage) ($10,000), at the rear providing 2 parking spaces, having vehicular access from the WALLACE STREET.
HOME OWNER BUILDER
1.\tCovenant to be registered prior to sheathing inspection. 2.\tNo Strata Titling permitted 3.\tMechanical unit proposed – Exterior component located in REAR YARD, Interior component located in PARTIAL STOREY. 4.\tSchedule B: (Jason Hui) P.Eng (778-319-3403) Structural 5.\tSchedule B: (Jason Hui) P.Eng (778-319-3403) Geotechnical 6.\tHPO: Owner Builder- (Chang Ye Gong)
Note: This is a 2½ -storey building pursuant to the Zoning and Development By-Law
Note: The entire building to be sprinklered to NFPA 13D
Address Information: #1-5738 Wallace St - Principal Dwelling (1st-3rd floors) #2-5738 Wallace St - Secondary Suite (basement)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
NEW R1-1 BYLAW
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Analyst briefWin likelihood: high
Homeowner-builder (QI LI / LQ Design Group) pulling $953k permit for two-storey detached with basement secondary suite and detached garage. Fresh issue (May 2026), early-stage construction. Direct owner involvement signals flexibility on trade selection.
Offer to coordinate flooring across main and secondary suite—homeowners often need guidance on materials consistency.
Contractor: Chang Ye Gong · Applicant: QI LI DBA: LQ Design GROUP Ltd
Issued 2026-05-01 · issued 12 days ago · Permit BP-2025-00567 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - BP after DP-2024-00986 & M/A DP-2025-00674
Interior and exterior alterations to this existing Multiple Dwelling building to convert the existing storage, recreation room, and laundry room to two dwelling units and a portion of the existing mechanical room to a new laundry room and to increase the number of units from 8 to 10 rental dwelling units in this existing 4-storey multiple dwelling building. Scope of work includes expansion of existing public corridor into the existing garage leading to exit by replacing an existing garage overhead door with a smaller garage door, infill wall, and an exterior exit door, installation of new footings under the new west unit, reduction of the existing mechanical room, and relocation of the laundry room.
Sch A, Arch B, Struct B, Mech B, Plbg B, Elec B, and Sch D are submitted.
***REVIEWED UNDER VBBL 2019 WITH AMENDMENTS EFFECTIVE ON FEB 28, 2025***
Analyst briefWin likelihood: med
Architect-led conversion of 8-unit building to 10 units with interior/exterior alterations on 4-storey multiple dwelling. Primus Home Inspections listed as contractor but scope suggests need for specialized trades. $309k value, recent issue. Strong residential multifamily play.
We handle major reno coordination for multi-unit conversions—can support your team on the interior/exterior phasing.
Contractor: Primus Home Inspections Ltd. · Applicant: Raul Alcocer DBA: Architect
Issued 2026-04-30 · issued 13 days ago · Permit BP-2025-01110 · New Building
High Density Housing / Commercial - New Building - ***************PART 5 BUILDING***************************** To construct 3 storey certified passive house single family dwelling (most of living level program at the 4.6 m floodplain level) and below the main level for a 2 car attached garage, as well as a lavender harvesting and drying operation housed in a one-storey accessory building. + attached pool.
******THIS PERMIT HAS BEEN REVIEWED & ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 AND AMENDMENT EFFECTIVE FEBRUARY 27, 2025 ********
Building Review Branch Notes: 1.\tThis lot is to not Stratified. 2.\tAll dwelling units have separate unobstructed exterior entrances at all time. 3.\tEntire building to be sprinkler to NFPA 13D requirement. 4.\tPropose fire bowl to be in compliance to Bulletin 2021–001-FI 5.\tAll new windows, doors, and skylights shall conform to AAMA/WDMA/CSA101/I.S.2/A440, NAFS. 6.\tSeparate building permit required should accessory building operation is to include (essential oil distillery)
Analyst briefWin likelihood: high
Keystone Projects is building a $2.5M custom passive-house single family with attached pool and lavender-drying accessory building. Homeowner-driven, issued April 2026. Smaller scope but specialized finishes (windows, pool) and flood-resilience detailing.
Mention experience with passive-house windows and flood-resilient construction detailing.
Issued 2026-04-30 · issued 13 days ago · Permit DB-2025-04799 · Addition / Alteration
Field Review - Addition / Alteration - 2277 McGill St
Exterior alterations to provide residential improvements to this existing multiple dwelling on this site.
Scope of work includes building envelope, replacement of door and window. Slab waterproofing with new landscaping assembly. New flat roof assembly replacement.
Schedule B Arch / Structural: Alfredo Jo - BC Building Science LTD 604-520-6456
Schedule D: Alfredo Jo - BC Building Science LTD 604-520-6456
Schedule A: Alfredo Jo - BC Building Science LTD 604-520-6456
OK for Field Review per DBI Clint C. (November 17, 2025) OK for DB per Sahar H. (November 17, 2025)
This permit was reviewed under VBBL 2019
Analyst briefWin likelihood: med
BC Building Science (applicant Philip Tan) is leading a $1.6M envelope renovation on a multi-dwelling: roof, windows, doors, waterproofing, landscaping. No contractor named yet—project is in field-review stage. Reno scope is strong, but design professional is driving decisions.
Contact the architect directly to position for roof and window replacement on multi-unit residential envelope work.
Issued 2026-04-30 · issued 13 days ago · Permit DB-2026-00128 · New Building
Low Density Housing - New Building - To construct a 2.5 storey duplex with a lock-off unit located on the main floor ($1,200,000) with an attached garage providing 2 parking spaces having vehicular access from the street and a detached accessory building (bike storage) at the rear.
Note: The entire building, INCLUDING THE ATTACHED GARAGE, to be sprinklered to 2 x NFPA 13D
1.\tCovenant to be registered prior to sheathing inspection. 2.\tHRV unit proposed - located in half storey hallway closet 3.\tHeat pump unit proposed – Exterior component located in East and West sideyard, Interior component located in half storey hallway closet 4.\tBar sink located in FLEX RM 5.\tSchedule B: (J.J.S. Hui) P.Eng (604.831.1431) Structural & Geotechnical 6.\tHPO: Residential Builder- Asanti Development Limited
Note: This is a 2.5 storey building pursuant to the Zoning and Development By-Law
Address Information:
West Side #1- 3330 W 43rd Av - One Dwelling Unit (North Portion of 1st floor, 2nd & 3rd floor) #2- 3330 W 43rd Av - Lock off Unit (South portion of 1st floor)
East Side 3328 W 43rd Av - One Dwelling Unit (1st - 3rd floor)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address numbers are to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Analyst briefWin likelihood: high
Homeowner-applicant (Carman Kwan) pulled permit for 2.5-storey duplex with lockoff unit ($1.2M). HVAC scope includes HRV system. Asanti Development is contractor. Recent issue (Apr 30), residential new-build is solid fit.
Offer to handle HRV sizing and installation coordination for this new duplex with secondary suite.
Contractor: Asanti Development Ltd · Applicant: Carman Kwan DBA: Architectural Collective Inc.
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-01019 · Addition / Alteration
Field Review - Addition / Alteration - #510 - 5th floor (demise into #510 & #540)
Interior alterations on the 5th floor to demise the existing office #510 into two units to be #510 and #540 and to provide tenant improvements only to suite #510 in this existing commercial building on this site.
Scope of work: Construct a demising wall to create 2 suites, new partitions for new offices, new suite entry doors, flooring, millwork. Electrical, mechanical/plumbing and sprinkler work to suit.
TENANT: HHBG Law Corp
Letters of Assurance submitted: \t\t Schedule A and Architectural Schedule B by Ting Ho Cheung, Architect, AIBC., 604.779.1318\t\t Electrical Schedule B by Roger Dupuis, P.Eng., 604.569.6500\t\t Plumbing/Mechanical Schedule B by Bassam Yammine, P.Eng.,604.609.0500 x107\t\t
Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
Downtown commercial demise project splitting one office into two units on the 5th floor of 815 W Hastings. $500k permit issued April 30th to Allspaces Design & Management. HVAC scope includes mechanical rough-in and balance for two separate tenant spaces—mid-size alteration with clear mechanical divisions.
We handle multi-tenant HVAC splits in commercial buildings; interested in coordinating the mechanical zoning?
Contractor: Allspaces Design & Management Ltd · Applicant: Bill Driffield
Issued 2026-05-12 · issued yesterday · Permit DB-2025-03278 · New Building
Low Density Housing - New Building - 2.0 LWH
To construct a 2-storey laneway house building ($417,735.00) with 1 open parking pad having vehicular access from the 20' (location) Lane.
1.\tCovenant registered at the Land Title Office under CB2296568 2.\tNo Strata Titling permitted 3.\tNo external mechanical unit proposed 4.\tSchedule B: (JASON BAL) P.Eng (604-657-8809) Structural 5.\tSchedule B: (JASON BAL) P.Eng (604-657-8809) Geotechnical 6.\tHPO: Residential Builder- (BuilderCompanyName)
Note: The entire building to be sprinklered to NFPA 13D
Note: This is a 2-storey building pursuant to the Zoning & Development By-law.
Address Information:
BUILDING 2 7291 Ashburn St - Laneway House (2.0 story)
Address numbers assigned as per approved plans for Fire and Emergency response. The address numbers are to be posted to the building to be visible from the street and in accordance with the Building By-law prior to final inspection.
NEW R1-1 BYLAW
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Field Review - Addition / Alteration - Interior alterations to provide tenant improvements to this existing Fitness Centre. The scope includes to upgrade all existing lighting to new LED, select new finishes (paint, new flooring) and demise one shower into 2 toilet rooms.
OK for field review per DBI
Contractor: VPAC Construction Group Ltd · Applicant: Ehsan Vali DBA: ValiDesign
Issued 2026-05-11 · issued 2 days ago · Permit DB-2025-02058 · New Building
Low Density Housing - New Building - To construct a 2 storey laneway house building ($250,000) with an open parking area, providing a total of 1 parking space, having vehicular access from the 20' lane.
Note: The entire building to be sprinklered to NFPA 13D
Note: This is a 2 storey building pursuant to the Zoning & Development By-law
1.\tCovenant registered at the Land Title Office under CB2610444 2.\tNo Strata Titling permitted 3.\tNo external mechanical unit proposed 4.\tSchedule B: (X.L.Chen) P.Eng (778-235-5447) Structural 5.\tSchedule B: (J.J.S.Hui) P.Eng (778-319-3403) Geotechnical 6.\tHPO: Residential Builder – C-Best Construction Ltd.
Address Information: Building 2 #3-459 E 57th Av - Laneway House (2 Storey)
Address and suite number assigned as per approved plans for Fire and Emergency response. The address number is to be posted to the building to be visible from the street and the suite number is to be posted at the suite entry in accordance with the Building By-law prior to final inspection.
Note: See DB-2025-02055 for Bldg 1 on site (principal bldg) addressed #1-459 E 57th Av.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Contractor: C-Best Construction Ltd · Applicant: Bhupinder (Raj) Singh DBA: Raj Home Design
Issued 2026-05-11 · issued 2 days ago · Permit BP-2024-05151 · New Building
High Density Housing / Commercial - New Building - Building Permit for BP-2024-02016
To construct a 3-storey multiple dwelling building over one level of underground parking with storages, bike storages, and service rooms, having vehicular access from the rear lane.
This is a CP Process Permit and the applicant is Koosha Kheradmandria, P. Eng., CP.
Building to be sprinklered to NFPA 13.
*REVIEWED UNDER VBBL 2019
Refer to Site Permit BP-2024-02016 for all drawings and documents for this site.
Refer to BP-2024-05151 for Building 1 Refer to BP-2024-05152 for Building 2 Refer to BP-2024-05153 for Building 3
STAGED CONSTRUCTION Stage 3: Full Construction- (2026-05-11- S.Le) Refer to DPMA DP-2025-00786 Change of Structural Engineer of Record from Damoon Motamedi, Ph.D., P.Eng., from Raft Consulting Ltd., to Yeming Li, P.Eng., Struct.Eng., from Deer Lake Engineering & Associates Ltd. effective November 5th, 2025.
Issued 2026-05-08 · issued 5 days ago · Permit BP-2026-01375 · Addition / Alteration
Field Review - Addition / Alteration - 2337 MAIN ST
Interior alterations at 2337 MAIN ST to provide tenant improvements and change of use and major occupancy from this existing Retail Store (Group E) to Health Care Office (Group D) for a new tenant at 2337 Main Street on the ground floor of this existing commercial building on this site.
Okay for Field Review as per I.Celic April 24, 2026
Contractor: QKD Construction Ltd · Applicant: Jason Cho
Issued 2026-05-07 · issued 6 days ago · Permit DB-2025-02342 · New Building
Low Density Housing - New Building - To construct a 1 storey laneway house building ($100,000) with 1 open parking pad having vehicular access from the 20' Lane.
Note: The entire building to be sprinklered to NFPA 13D Associated with 3 Case Files: CF-2024-00152, CF-2023-01279 & CF-2026-000055
Note: This is a 1 storey building pursuant to the Zoning & Development By-law.
1.\tCovenant not required with existing house 2.\tNo Strata Titling permitted 3.\tHRV proposed – Located in dining room closet 4.\tSchedule B: (J.Peng) P.Eng (778.998.0616) Structural 5.\tHPO: Residential Builder- Laneside Homes Ltd
NOTE: To achieve the required FSR. A floor space exclusion of 2% has been applied to this application as per section 10.15.1 of the Zoning-Bylaw, to accommodate improved building performance.
Address Information:
Building 2 #3-4784 Ross St - Laneway House (1.0 storey)
Note: As a result of the addition of a laneway house, the main house / principal dwelling will be assigned a suite number and the site will be as follows: #1-4784 Ross St - Principal Dwelling #3-4784 Ross St - Laneway House
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
NOTE: Information regarding the principal building on the survey and site plan is for reference only. Any discrepancy between information regarding the principal building on the survey and/or site plan and approved permit drawings for the principal building are neither approved nor authorized under this laneway house permit.
Note: Bldg 1 (principal bldg) addressed #1-4784 Ross St retained on site.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Contractor: Laneside Homes Ltd · Applicant: Jason Hyare DBA: Laneside Homes Ltd
Issued 2026-05-05 · issued 8 days ago · Permit BP-2026-00734 · Addition / Alteration
Field Review - Addition / Alteration - #490-9123 Bentley St
Interior alterations to provide first tenant improvements and a change of use/occupancy of approx. 2100 SF to this existing Office - Shell (Group D) tenant, for a new for a new Artist Studio-Class A (Group F2) at #490-9123 Bentley Street on the 4th floor of this existing mixed-use building on this site.
Okay for Field Review as per Jamie Steen March 4, 2026
Schedule A provided by Richard Kadulski, Architect AIBC | Richard Kadulski Architect | 604-689-1841
Schedule B (Architectural) provided by Richard Kadulski, Architect AIBC | Richard Kadulski Architect | 604-689-1841
Schedule B (Mechanical/Plumbing) provided by Satwinder Pal Singh, P.Eng | TAG Engineering Inc | 604-564-6800
Issued 2026-05-04 · issued 9 days ago · Permit DB-2026-01283 · Addition / Alteration
Field Review - Addition / Alteration - 1010 CANADA PLACE
Interior alterations to expand 1010 CANADA PLACE into a portion of the ancillary offices to the existing hotel at 1038 CANADA PLACE and provide tenant improvements to an existing Retail (Group E) store - approx. 3234 sq ft., for a new retail tenant on the ground floor of this existing mixed-use building on this site.
Okay for Field Review as per Dave H. April 20, 2026
Notes: 1. A sprinkler permit may be required based on field review site observations. 2. Contractor required a valid City of Vancouver Business Licence or IMBL
Issued 2026-04-29 · issued 14 days ago · Permit BP-2026-00655 · Addition / Alteration
Field Review - Addition / Alteration - 9149 Hudson St
Interior alterations only to provide two new catwalks including new steel columns and footings for bay #10 and #12 in this existing public authority use (transit facility) building.
OK for field review per Jame Z. Feb 26, 2026
Letter of Assurance: Sch A & Sch B (Struct): Dennis Xi Cheng, P. Eng. - 604.293.1441, chengd@ae.ca Sch B (Mech & Plbg): Zvjezdan (Dan) Vujicic, P. Eng - 604.293.1441 - vujicicd@ae.ca Sch B (Elec): Derek R.A. Desaulniers, P. Eng. - 604.293.1441, desaulniersd@ae.ca
Note: (1) Contractor to have a valid Vancouver Business License or Intermunicipal Business Licence
(2) Work under this permit does not authorize excavation beyond the existing slab, including the disturbance of soils. Should work necessitate excavation or the disturbance of soils, stop work immediately contact the City of Vancouver, and consult an Archaeologist or the Archaeological Branch of British Columbia for the necessary approvals.
Issued 2026-04-29 · issued 14 days ago · Permit BP-2025-04275 · New Building
Low Density Housing - New Building - Building Permit for DP-2025-00820 to construct a Multiple Dwelling 'Multiplex' with a three-storey two-unit unit front building, with three parking spaces in the rear building attached carport having vehicular access from the lane.
Note: The entire building to be sprinklered to 2 x NFPA 13D
Note: This is a 3 storey building pursuant to the Zoning and Development By-Law
1.\tHRV proposed – Located in second floor laundry room 2.\tHeat pump proposed – Exterior component located in front and rear patio, Interior component located in third floor closet 3.\tSchedule B: J.H.P. Pao P.Eng (604.972.0115) Structural & Geotechnical 4.\tHPO: Residential Builder- Aqua Homes Development Ltd.
Address Information:
Building 1 (Front) (North) #1-3114 Graveley St- One Dwelling Unit (north side 1st-3rdfloors) #2-3114 Graveley St - One Dwelling Unit (south side 1st-3rd floors)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Contractor: Aqua Homes Development Ltd · Applicant: QI LI DBA: LQ Design GROUP Ltd
Issued 2026-04-29 · issued 14 days ago · Permit BP-2026-00818 · New Building
Low Density Housing - New Building - To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey one-unit rear building with three surface parking spaces having vehicular access from the lane.
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
Note: The entire building to be sprinklered to NFPA 13D
Address Information:
Building 1 (Front/South) #1-2548 Oxford St - One Dwelling Unit (1st - 3rd floor) #2-2548 Oxford St - One Dwelling Unit (1st - 3rd floor)
Addresses and suite numbers assigned as per approved plans for Fire and Emergency response. The Address s numbers are to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Issued 2026-04-29 · issued 14 days ago · Permit BP-2025-04277 · New Building
Low Density Housing - New Building - Building Permit for DP-2025-00820 to construct a Multiple Dwelling 'Multiplex' with a two-storey one-unit rear building with an attached carport providing three parking spaces having vehicular access from the lane.
Note: The entire building, INCLUDING THE ATTACHED CARPORT, to be sprinklered to NFPA 13D (BULLETIN 2024-002-BU)
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
1.\tHRV proposed – Located in second floor kitchen 2.\tHeat pump proposed – Exterior component located in court yard, Interior component located in main floor mech room 3.\tSchedule B: J.H.P. Pao P.Eng (604.972.0115) Structural & Geotechnical 4.\tHPO: Residential Builder- Aqua Homes Development Ltd.
Address Information:
Building 2 (Rear) (South) 3116 Graveley St- One Dwelling Unit (1st-2nd floors)
Address number assigned as per approved plans for Fire and Emergency response. The address number is to be posted and to the building and to be visible from the street in accordance with the Building By-law prior to final inspection.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Contractor: Aqua Homes Development Ltd · Applicant: QI LI DBA: LQ Design GROUP Ltd
Issued 2026-04-29 · issued 14 days ago · Permit BP-2026-00819 · New Building
Low Density Housing - New Building - To construct a Multiple Dwelling "Multiplex" with a three-storey two-unit front building and a two-storey one-unit rear building with three surface parking spaces having vehicular access from the lane.
Note: This is a 2 storey building pursuant to the Zoning and Development By-Law
Note: The entire building to be sprinklered to NFPA 13D
Address Information:
Building 2 - (Rear/North) 2550 Oxford St - One Dwelling Unit (1st & 2nd floor)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address numbers are to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***