High Density Housing / Commercial - Addition / Alteration - #720 - 7th Floor - Interior alterations to demise the existing two-storey suite #720 (Group D - Office) into two suites adding suite #800 in this high-rise commercial building.
Notes: \t\t\t 1. Reviewed per the 2025 VBBL 2. Schedule A and Architectural Schedule B by Miren Amaya Del Castillo, Architect, AIBC., 604.562.4617, Electrical Schedule B by Chris Fontaine, P.Eng., 604.298.4858, Mechanical Schedule B by Stephen Kooiman, P.Eng., 604.298.4858 3. Building is Sprinklered – Separate sprinkler permit required for proposed sprinkler work. 4. Related to Alternative Solution AL-2026-00024 for glazing within 2-Hr fire separation.
Analyst briefWin likelihood: high
Chris Fontaine (P.Eng.) signed electrical Schedule B for $400k high-rise office suite demise on 7th Floor. M Moser Associates is contractor; work involves splitting one suite into two with full MEP separation. This is prime subcontract work for panel relocation and circuit distribution.
Reach out to confirm electrical load requirements for new suite separation and panel feed coordination.
Interior alterations to provide improvements for a new tenant on the 7th floor (#700) of this existing commercial building on site.
Scope of work: Selective demo includes reception, rooms, offices to create an open space. Construct new exterior windor offices, create elevator lobby, glazing sidelights on all offices/meeting rooms, flooring, paint, electrical and sprinkler work to suit.
TENANT: Invictus Accounting Group LLP
Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
Full-floor office reno for Invictus Accounting at 1199 W Hastings, $325k. Totalplan Inc. submitted May 12th. Scope includes selective demo, new offices, and mechanical/electrical to suit. Established contractor on high-end commercial interiors—solid lead with clear HVAC requirements.
Totalplan's projects need reliable mechanical partners; we've worked similar Hastings corridor builds.
Contractor: TotalPlan Inc · Applicant: Totalplan Admin DBA: Totalplan Inc.
hvacelectricalplumbingwindowsflooringpaintnew buildreno major
High Density Housing / Commercial - Addition / Alteration - Interior alterations to provide fire alarm and electrical improvements to this building on all floors, in this existing mixed-use commercial high-rise building on this site.
Scope of work: replacement of existing panel with new addressable fire alarm control and annunciator panel, Provide and install (15) new smoke detectors for future elevator recall, Provide and install (18) new speaker strobes, Remove (11) fire alarm node panels, Reconnect existing addressable devices, Verification of the fire alarm system in conformance with CAN/ULC S537
Notes: 1. New smoke detectors install are for future elevator recall on a separate application. 2. Permit reviewed and approved to VBBL #14343 (2025).
Analyst briefWin likelihood: low
Action Electric Ltd (applicant/likely contractor) pulled $276k permit for fire alarm and electrical upgrades across all floors in mixed-use high-rise. Scope: new addressable panel, smoke detectors, speaker strobes. This is a control system refresh—callableif you partner on large-building retrofit work.
Confirm whether Action Electric needs subcontractor support for speaker strobe installation or panel wiring.
High Density Housing / Commercial - Addition / Alteration - Interior alterations to provide tenant improvements, change the use and major occupancy at Unit 101 from Health Care Office (Group D) to Fitness Centre Class 2 (Group A2) in this existing commercial building on this site.
Reviewed under the VBBL 2025
Maximum 100 persons occupant load. A permanent sign indicating that occupant load shall be posted in a conspicuous location.
Analyst briefWin likelihood: low
Commercial tenant improvement converting healthcare office to fitness centre in high-density building. Architect-led, $250k value, recent issue. Niche commercial play with occupancy code compliance. Limited residential reno overlap.
This is a commercial fitness fit-out—likely outside typical residential reno scope.
Applicant: Alireza Danesh DBA: Danesh Architect Inc.
Field Review - Addition / Alteration - #200- 8425 Granville Street
Interior alterations to provide first tenant improvements to this existing Office-Shell (Group D) unit, for a new approx. 748 sqft Office (Group D) tenant in unit #200 on the 2nd floor of this existing commercial building.
Scope of work: partitions, doors, glazing, millwork, furniture, fixtures, equipment, mechanical, plumbing and sprinkler
Okay for Field Review as per Allyson B. - April 16th, 2026
Schedule A & Schedule B Architectural - Jeff Shen, AIBC - 604-210-9898, jeff.s@jsarchitect.ca Schedule B - Mechanical & Plumbing - Alex Z.Q. Li, P.Eng - 778-323-1368 Schedule B - Electrical - Guowei Wang - 604-336-9363, info@wgweng.com
Analyst briefWin likelihood: high
Kai Jiang pulled a $80k permit for first-time tenant fit-out in an office shell (748 sqft, unit #200). Electrical is included. Field Review approved mid-April; work is design-locked and ready to proceed. No contractor named, making this open territory.
You handle small-to-medium office buildouts—call to quote the electrical for this shell-to-suite conversion.
Field Review - Addition / Alteration - Interior alterations to provide tenant improvements for a new tenant Low Occupant Fitness Centre (Group D) in this existing commercial building on this site.
Scope of work: Demising and construction of partition walls, new flooring, millwork, electrical and plumbing work to suit. Related to CF-2025-007408
Schedule B Arch provided by Peter Yee, Engineer, 604-255-3868, pyeng@telus.net
Ok for Field Review as per DBI P. Lidder
Analyst briefWin likelihood: high
Wing Chu pulled a $50k permit for fitness centre tenant improvements in existing commercial space. Electrical and plumbing in scope. Field Review approved; design is done. No contractor named. Electrical work is likely still unassigned.
Offer to quote electrical for the fitness centre fit-out—you handle the lighting and equipment circuits.
Issued 2026-05-11 · issued 2 days ago · Permit BP-2026-01061 · Addition / Alteration
Certified Professional Program - Addition / Alteration - #3146 (Kith)
First Tenant Improvement for this Retail Store (Group E) on the ground floor of the Oakridge Mall.
Scope of work includes an ice cream booth ("Kith Treats") as part of the retail store.
***Reviewed under the VBBL 2025***
Stage 1 - Full Construction Tenant Improvement (First TI) issued on May 11, 2026.
Analyst briefWin likelihood: med
Prodigy Retail Construction is executing first tenant improvement for a Kith ice-cream booth at Oakridge Mall ($2.8M retail fit-out). Fresh permit, single contractor in control. Flooring and reno work align with your scope, but this is a specialized retail shop-fit with existing vendor relationships.
Mention experience coordinating flooring and finishing in high-traffic retail environments under tight mall schedules.
Contractor: Prodigy Retail Construction Inc · Applicant: David Steer DBA: LMDG Building Code Consultants Ltd.
Issued 2026-05-11 · issued 2 days ago · Permit DB-2026-00859 · Addition / Alteration
Field Review - Addition / Alteration - 196 W 20th Ave
Exterior and Interior alterations to provide residential improvements to this existing single detached house on this site.
Scope of work includes updates to living room. office, powder room, kitchen on the main floor; bathroom, bedrooms and closets on the upper floor; bedroom, bathroom, laundry room and home theater on the basement floor; new windows, and doors throughout.
Okay for field review as per J.Ly, March 13, 2026
This is a sprinklered building. Sprinkler Contractor: Preet Plumbing, Heating, and Sprinkler Ltd
Letter of Assurance: Schedule B (Struct) provided by Allester Engineering (2025) Ltd.- Scott Ash- Anderson, P.Eng ph#: 604-228-0518
This permit was reviewed under VBBL 2025.
Analyst briefWin likelihood: high
Blackfish Homes is executing $1.5M interior/exterior reno on a single-family home: flooring, windows, doors, kitchen, bathrooms across three levels. Homeowner-pulled (Carly Zurbuchen), small contractor, recent permit, scope aligns perfectly with major reno trade.
Call to discuss flooring selections and coordination across multi-floor renovation timeline.
Contractor: Blackfish Homes Ltd · Applicant: Carly Zurbuchen
Issued 2026-05-11 · issued 2 days ago · Permit DB-2025-00998 · New Building
Low Density Housing - New Building - To construct a 1 storey laneway house building ($500,500.00) with an attached garage, providing a total of 3 parking spaces, having vehicular access from the rear 20' Lane.
Refer to AL-2025-00106 for alternative solutions.
1.\tCovenant to be registered prior to sheathing inspection. 2.\tNo Strata Titling permitted 3.\tNo external mechanical unit proposed 4.\tEntire building to be sprinklered NFPA 13 5.\tSchedule A: (Peter Rose) P.Eng (604.736.7939) 6.\tSchedule B: (Peter Rose) P.Eng (604.736.7939) Architectural 7.\tSchedule B: (Tim Lam) P.Eng (604.255.7670) Structural 8.\tSchedule B: (Tim Lam) P.Eng (604.255.7670) Geotechnical 9.\tHPO: Residential Builder- Seven Homes Ltd. 10.\tHRV required for laneway house as of year 2022
Address Information:
Building 2 #3- 4770 Drummond Dr - Laneway House (1 storey)
Address and suite number assigned as per approved plans for Fire and Emergency response. The address number is to be posted to the building to be visible from the street and the suite number is to be posted at the suite entry in accordance with the Building By-law prior to final inspection.
Note: As a result of the addition of a laneway house, the main house / principal dwelling will be assigned a suite number and the site will be as follows: #1- 4770 Drummond Dr - Principal Dwelling
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Analyst briefWin likelihood: med
New laneway house construction ($500k) with Seven Homes as contractor; issued mid-May, sprinklered building, architect-led. Early-stage new build with established residential builder. Good opportunity for flooring and renovation-phase work once framing and mechanical rough-ins complete.
Contact Seven Homes to discuss flooring and interior finish scope for the new laneway house build.
Contractor: Seven Homes Ltd. · Applicant: David Pritchard DBA: Peter Rose Architecture
Issued 2026-05-11 · issued 2 days ago · Permit BP-2026-01153 · Addition / Alteration
Enquiry Centre - Addition / Alteration - Building 1 - 2660 E 48th (wings 1,2 & 3)
Voluntary fire alarm upgrades to this existing Senior Supportive Housing Dwelling building on this site.
Install heat detectors and audible alarms connected to a combined newly installed monitored fire alarm system.
Schedule B Electrical: Kevin Zirul - Opal Engineering - 250-882-9422
Related Electrical permit:EP-2026-03711 Work to be performed in conjunction with BP-2026-01154 (building 2)
Analyst briefWin likelihood: high
Senior housing fire alarm upgrade at $410k. Kevin Zirul (Opal Engineering) is listed Schedule B electrical contact—this is a monitored system install with heat detectors and audible alarms across multiple wings. Direct opportunity if you handle institutional alarm system wiring.
Ask to quote heat detector wiring and alarm panel integration for senior housing compliance work.
Applicant: Daniel Aird DBA: Draw Construction Ltd.
Interior alterations to provide improvements to this full floor office space on the 4th floor (#401) of this existing commercial building on this site.
Scope of work: complete tenant fit out to shell space.
* See BP-2026-00573 for interior demo.
* In accordance with VBBL 2025
Architectural Schedule B submitted by Paul Chiu, Architect AIBC. Ph#604-250-2163
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: low
Fourth-floor office shell fit-out at 2608 Granville, $250k, issued May 11th. Architect Paul Chiu is applicant; no contractor named yet. Full mechanical design and installation needed for tenant space. Early-stage project with open contractor selection.
Architect-led project with no mechanical contractor assigned yet—outreach to Paul Chiu directly.
Applicant: Paul Chiu DBA: Urban Design Group Architects Ltd.
Issued 2026-05-11 · issued 2 days ago · Permit DB-2026-01232 · Addition / Alteration
Direct to Inspections - Addition / Alteration - Exterior alterations only to provide for the installation of four (4) antennas on this existing tower on this site. OK for DTI as per N. Jalalkamali, March 16, 2026.
Letters of assurance submitted: Sch A: Alan Ho P.Eng., 778.288.4228 Sch B (Architectural & Structural) Alan Ho P.Eng., 778.288.4228 Sch B (Structural) Nima Rahgozar P.Eng.,604.946.0253 Sch B (Electrical): Rafik S.F.S. Yonathan P.Eng., 778.288.4228
NOTE: It is the responsibility of the Applicant/Owner to call for a final inspection once the Schedule C-A and C-B (Letters of Assurance) are received as per the District Building Inspector.
Analyst briefWin likelihood: low
Tawny Verigin pulled a permit for antenna installation on an existing tower—exterior work only, issued May 2026. A licensed P.Eng. (Rafik Yonathan) is assigned for electrical scope, suggesting the design phase is locked. This is infrastructure work; call to introduce yourself as backup or learn if electrical subcontractor is already locked.
Confirm whether the electrical subcontractor for antenna wiring installation is finalized.
Issued 2026-05-11 · issued 2 days ago · Permit DB-2026-01103 · Addition / Alteration
Field Review - Addition / Alteration - 1597 E Kent Ave N
Interior alterations to validate the addition of floor space on the 2nd floor (approx. 36SF) through the addition of a storage room and a Change of Use from Wholesale class A with ancillary storage to Production Studio (Group F2) on the 1st and 2nd level of this existing industrial building on this site.
Scope of work: partitions, doors, plumbing, electrical, millwork, furniture, fixtures and equipment
Okay for Field Review as per Isidora Celic April 2, 2026
Structural schedule B signed and sealed by Jie Peng, P.Eng, 778.998.0616 Schedule B (Mech/Plumb) provided by Alula Yadete, P.Eng. | Abyssinia Consulting Inct. | 778-939-1907
Analyst briefWin likelihood: high
Alula Yadete's consulting firm pulled an $80k permit to convert industrial space to a production studio with a second-floor storage addition. Electrical work is in scope. Field Review approved; design is locked. No contractor named, so electrical subcontractor is likely still open.
Mention experience with electrical in industrial-to-studio conversions, especially for production equipment power.
Issued 2026-05-08 · issued 5 days ago · Permit BP-2019-04569 · New Building
Certified Professional Program - New Building - To construct a 10-storey mixed-use high building and 6-storey mixed-use combustible midrise building over 2-levels of above ground parking consisting of 1st storey - social enterprise space and parkade 2nd storey - parkade 3rd to 4th storeys - withdrawal management and care centre 5th to 10th storeys - 97 social housing units
This application is being processed under the SHORT program and VBBL 2019.
STAGED CONSTRUCTION Stage 1: Excavation and Shoring - issued July 25, 2024
Stage 2: Foundation Up to and Including Level 1 - issued Sept. 23, 2025
Revision #1: Addition of Geotechnical Engineer for Temporary Geotechnical Discipline; Substitution of Shoring Drawings - issued May 2, 2025
Revision #2: As of August 21st, 2025, Darrell Li taking over the role of Certified Professional from Dean Skalski
Revision #3: As of December 5, 2025, Dean Skalski is the CP for this project.
Stage 3: Structure from Level 2 Floor Slab up to Level 4 Floor Slab (structural only) - issued May 8, 2026 Note: No separate sprinkler permit application has been submitted for this stage. One has been submitted for Stage 2 and another for Stage 4. No sprinkler work shall commence on Levels 3 and 4 until the Stage 4 BP has been issued.
Stage 4: Full Construction - In review
Analyst briefWin likelihood: low
Chandos Construction pulled a $95M mixed-use social housing project with staged excavation underway. This is institutional scale—detoxification centre with 97 units across 10 storeys. Major renovation scope fits your trade, but decision-makers are architects and the municipality, not the contractor.
Not recommended—institutional project with established GC and design team.
Contractor: Chandos Construction · Applicant: Dean Skalski DBA: Certified Professional
Interior alterations to provide a first tenant improvement to this full floor office shell space on the 6th floor (#600) of this existing commercial building on this site.
Scope of work: complete tenant fit out to shell space. Electrical, mechanical/plumbing and sprinklers to suit.
* In accordance with VBBL 2025
Letters of Assurance submitted: \t\t\t Schedule A and Architectural Schedule B by Andrew Igel, Architect, AIBC., 778.839.4260\t\t Electrical Schedule B by Cameron Ballard, P.Eng., 604.347.9722\t\t Plumbing/Mechanical Schedule B by Joseph Braun, P.Eng., 604.609.0500\t
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
Reotech Construction is fitting out a full 6th-floor office shell ($2M) with mechanical, electrical, and plumbing. Issued May 8, this is early-stage tenant improvement work. Larger GC involved, but HVAC scope is clear and current.
Ask Reotech about their mechanical subcontractor for this full-floor office shell fit-out.
Contractor: Reotech Construction Ltd · Applicant: Janay Koldingnes DBA: Edit Studios Inc.
interior alterations to provide improvements for a new office tenant on the 17th floor (#1750) of this existing commercial building on this site.
Scope of work: Complete tenant fit out to shell space . Electrical, mechanical/plumbing, & sprinklers to suit.
See BP-2025-04052 for interior demo.
* In accordance with VBBL 2025
Letters of Assurance - - Schedule A and Architectural Schedule B by Harrison Chan, Architect, AIBC. Ph#416-961-4111. - Electrical Schedule B by John-Paul Violante, P.Eng. ph#905-507-0800. - Mechanical Schedule B by Robert Luft, P.Eng. ph#905-507-0800.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
WZMH Architects pulled this 17th-floor office tenant fit-out ($1.9M) with full MEP scope on May 8. No contractor named yet—early stage. This is an architect-led design-build opportunity before GC selection hardens.
Contact WZMH Architects directly to discuss HVAC design and coordination for this 17th-floor office shell.
Issued 2026-05-08 · issued 5 days ago · Permit DB-2025-04323 · New Building
Low Density Housing - New Building - To construct a 2 storey laneway house building ($646,455.00) with 1 open parking pad, providing a total of 1 parking spaces, having vehicular access from the 20' Lane.
Note: The entire building to be sprinklered to NFPA 13D
Note: This is a 2 storey building pursuant to the Zoning & Development By-law.
1.\tCovenant not required with existing house 2.\tNo Strata Titling permitted 3.\tNo A/C Unit proposed 4.\tHeat pump proposed – Exterior component located east of laneway house 5.\tSchedule B: (A. Ahmed) P.Eng (604.579.0110) Structural 6.\tSchedule B: (P. K. L. Fong) P.Eng (604.837.3205) Geotechnical 7.\tHPO: Residential Builder- Smallworks Studios and Laneway Housing Inc.
NOTE: To achieve the required FSR. A floor space exclusion of 2% has been applied to this application as per section 11.24.18 of the district schedule, to accommodate improved building performance.
Address Information:
BUILDING 2 #3- 6125 Sherbrooke St - Laneway House (1st and 2nd Floor)
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
Note: As a result of the addition of a laneway house, the main house / principal dwelling will be assigned a suite number and the site will be as follows: #1- 6125 Sherbrooke St - Principal Dwelling
NEW R1-1 BYLAW This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.
Analyst briefWin likelihood: high
Homeowner-applicant (Jeremy Keyzer) pulled permit for 2-storey laneway house ($646k) with heat pump specified. Smallworks Studio is contractor. Issued May 8, residential new-build scope is direct HVAC work.
Reach out about supplying and installing the heat pump system for this new laneway house.
Contractor: Smallworks Studio and Laneway Housing Inc · Applicant: Jeremy Keyzer
Issued 2026-05-08 · issued 5 days ago · Permit BP-2026-01417 · Addition / Alteration
Field Review - Addition / Alteration - #D001 - 701 W Georgia Street
Interior alterations to provide tenant improvements to this existing retail space for a new retail tenant on the lower level (#D001) of this existing Pacific Center Mall building.
Okay for Field Review as per I.Celic April 29, 2026
Letters of Assurance: Schedule B - Arch & Schedule A: Parisa Seyed-Hoseini (236)601-9705 Schedule B - Elec: David Joo (778)869-2477 Schedule B - Mech & Plum: James Y.P.Lee (778)231-5278 Schedule B - Struc: Shi Li Qing (778)655-9518
Analyst briefWin likelihood: low
Retail tenant fit-out ($500k) in Pacific Center Mall; field review approved late April. Architect-led project with mechanical and electrical consultants named. Institutional commercial property with multiple professional stakeholders suggests slower decision-making and limited scope for major renovation trades.
Reach out to Cutler Architecture to confirm flooring and interior finishes are not handled in-house by mall management.
Issued 2026-05-08 · issued 5 days ago · Permit DB-2025-05269 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - Exterior and interior alterations to demise this existing Printing or Publishing (Group F2) with ancillary Office into two units and change the use of one of newly created units to Wholesale Class B (Group F2) with ancillary Retail (East side) and Storage Warehouse with ancillary Office (West side) on this site.
Proposed work includes providing tenant improvements to 3355 Grandview Highway (East side).
Existing building is partially sprinklered, limited to the West side of the building per Architect confirmation.
Analyst briefWin likelihood: med
$400k interior and exterior alterations splitting a commercial printing building into warehouse and retail units. Architect-led permit (MGBA Inc.) with no contractor named yet. Early-stage interior tenant improvements—good entry point if you handle commercial fit-outs.
We handle tenant improvements on commercial conversion projects like this one.
Applicant: Mallen Gowing Berzins Architecture Incorporated DBA: MGBA Inc.
Issued 2026-05-08 · issued 5 days ago · Permit BP-2026-01205 · Addition / Alteration
Field Review - Addition / Alteration - 2181 E 7th Avenue
Exterior alterations to restore the damaged roof and exterior wall at the front of this existing single detached house on this site.
Okay for field review as per J.Ly, April 14, 2026
Letter of Assurance: Schedule B (Structural) provided by DSW Structural Engineering Ltd. - Adam Samuel Densmore ph#: 778-791-7456
This permit was reviewed under VBBL 2025.
Analyst briefWin likelihood: med
Homeowner-pulled $350k permit for storm-damaged roof and exterior wall restoration on single detached house. Barclay Restorations named contractor, structural engineer assigned. If not fully contracted, strong recovery-work angle.
Ask Barclay Restorations if they need additional trades for this storm-damage exterior restoration.
Issued 2026-05-07 · issued 6 days ago · Permit BP-2026-00634 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to combine suite #2970 and #2975 AND to provide tenant improvement to this existing office tenant on the 27, 28, 29th floors of this existing commercial building on this site.
Scope of work: Demo/construct partition walls, ceiling, finishes, millwork, electrical, plumbing, mechanical, sprinkler work to suit. Stairs between levels 27 & 28 interconnected per BU431317 and not in scope of work.
Ok for Field Review as per R. Rattray
Schedule A and B Arch provided by Kevin Hanvey, Architect, 604-632-3350, khanvey@omicronaec.com Schedule B Mech and Plumb provided by Lucretia Marinela Dima, Engineer, 604-632-3350, mdima@omicronaec.com Schedule B Elect provided by Kevin Pearson, Engineer, 778-783-5502, kevin.pearson@introba.com
Analyst briefWin likelihood: med
Omicron Interiors is combining two office suites (27–29th floor) in a 700 W Georgia high-rise with full MEP scope. $8.3M value, field-review stage, issued May 7. Electrical work is core to tenant improvement fit-out on established contractor.
Ask about electrical phasing for suite interconnect and temporary power during demo/build phases.
Issued 2026-05-07 · issued 6 days ago · Permit BP-2025-05135 · Addition / Alteration
Low Density Housing - Addition / Alteration - Interior/exterior alterations to the single detached Heritage house to add to the north-east (rear) corner of the house at the basement and main floors.
Interior and exterior alterations to restore the accessory building to add a full underground level and 2nd level with conservatory to the existing garage/library.
Related to: DP-2024-00189
Schedule A/B Architectural - Hannah Leyland (604)-736-1419 Schedule D/B Architectural- Richard Kadulski Architect (604)-689-1841 Schedule B Structural - Tim Stockton, P.Eng (604)-228-0518 Schedule B Geotechnical - Gunther Yip, P.Eng. (604)-513-4190
Accessory building sprinklered to NFPA 13R
Analyst briefWin likelihood: high
Kerr Construction is mid-way through a $1.6M heritage house renovation: rear addition, garage restoration, new underground level, and conservatory. Recent issue, small contractor, scope directly matches major reno. Homeowner-facing project with clear subdivision of work.
Ask about interior finishes and flooring coordination—heritage builds often need specialized sourcing and scheduling.
Contractor: Kerr Construction Inc · Applicant: Leyland Architecture DBA: Leyland Architecture Inc.
Issued 2026-05-07 · issued 6 days ago · Permit BP-2025-02725 · Addition / Alteration
Low Density Housing - Addition / Alteration - Exterior and interiors alterations throughout this existing Heritage B Single Detached House with Secondary Suite on this inside with lane site. Scope of work includes raising the house to provide a full height basement, new roof at the rear, new insulation and cladding and a new rear deck.
Building to be sprinklered to NFPA 13 D standards.
Related to DP-2024-00517
Schedule B, Structural - Carlos Chiu, P.Eng, 604-737-9830.
'- REUP submitted by Peter Cho, City Green Solutions, 604-505-7837. Scope of work to include energy upgrade in accordance with Article 11.2.1.4 of the 2019 Vancouver Building By-law and as per the Energy Efficiency Upgrade Details noted in the Energuide Report. *Selected upgrades: fully insulate basement, exterior insulation min 1" thick, electrical panel upgrade. - Interconnected smoke alarms to be installed on each storey including basements, in each sleeping room and in a location between the sleeping room and the remainder of the storey and if the sleeping room is served by a hallway, the smoke alarm to be located in the hallway. Installed by permanent connections to an electrical circuit in conformance with 9.10.19. Provided with battery backup and manual silencing devices which will silence the alarm in conformance with 9.10.19.6. - Carbon Monoxide detectors to be provided in accordance with 9.32.4.2. - No strata titling will be permitted. - Dedicated 3' wide firefighter access path with overhead clearance of 2m to be maintained at all times. - An annual Vancouver Business Licence must be obtained prior to the rental of this approved one family dwelling and/or secondary suite on this site.
Analyst briefWin likelihood: high
Heritage house foundation raising and full exterior/interior reno ($600k), issued May 7. Homeowner-pulled permit (Topal and Sons Renovations as applicant, no contractor named yet). Early-stage, good entry point.
Mention experience with heritage basement-raising projects and coordinating electrical in foundation work.
Applicant: Heather Clark DBA: Topal and Sons Renovations
roofingelectricaldrywalllandscapenew buildreno major
Issued 2026-05-07 · issued 6 days ago · Permit DB-2026-00735 · New Building
Low Density Housing - New Building - To construct a 2 storey laneway house building ($500,000) with a carport, providing a total of 3 parking spaces, having vehicular access from the 20' Lane.
Note: The entire building to be sprinklered to NFPA 13D
Note: This is a 2 storey building pursuant to the Zoning & Development By-law.
1.\tMechanical unit proposed – Interior component located in the mechanical room 2.\tSchedule B: (K.J.MA) P.Eng (778.877.9016) Structural 3.\tSchedule B: (G.Z.ZHOU) P.Eng (604.838.2586) Geotechnical 4.\tHPO: Residential Builder- Kentwood Homes Ltd
NOTE: To achieve the required FSR. A floor space exclusion of 2% has been applied to this application as per section 10.15.1 of the Zoning-Bylaw, to accommodate improved building performance.
Address Information:
Building 2 #3-4420 Puget Dr - Laneway House (2.0 storeys)
Note: As a result of the addition of a laneway house, the main house / principal dwelling will be assigned a suite number and the site will be as follows: #1-4420 Puget Dr - Principal Dwelling #3-4420 Puget Dr - Laneway House
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
***This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025.***
Analyst briefWin likelihood: med
New two-storey laneway house ($500k) with Kentwood Homes as contractor; issued early May, sprinklered to NFPA 13D. Early-stage new build with established residential builder. Solid opportunity for flooring and interior finishing work once structural and mechanical phases advance.
Contact Kentwood Homes to discuss flooring and finishes timeline for the new laneway house construction.
Contractor: Kentwood Homes Ltd · Applicant: Mike Chu DBA: Westpoint Design & Development Ltd.
Interior alterations to provide improvment for a new office tenant on the 8th floor (#850) of this existing commercial building on this site.
Scope of work: demo to shell, remove and replace entrance door. New partitions, doors/frames, millwork, finishes. Electrical, plumbing/mechanical, sprinklers to suit.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
Single-floor office fit-out on the 8th floor at 999 W Hastings, $350k value. Applicant Jason Ludwig (Fusion Projects) pulled permit May 7th. HVAC scope is shell-to-finish mechanical, plumbing, and electrical for new tenant space—straightforward scope for an experienced mechanical crew.
We've completed similar office shells on Hastings; ready to quote your mechanical scope?
Contractor: Fusion Project Management Ltd · Applicant: Jason Ludwig DBA: Fusion Projects
hvacelectricalplumbingframingflooringnew buildreno major
Issued 2026-05-07 · issued 6 days ago · Permit BP-2026-01377 · Addition / Alteration
Direct to Inspections - Addition / Alteration - #311, 411, 412 and 413 - 133 W Pender St. Interior alterations to provide residential improvement due to fire/water damage to an existing dwelling units at #311, 411, 412 and 413 - 133 W Pender St. on the third and fourth floor of this existing multiple dwelling building on the site. Exterior alteration are limited to Unit 411 to remove and replace the fire damaged window and door. The replacement for window and door is like for like.
Okay for DTI per A. Best April 27, 2026
Analyst briefWin likelihood: high
Fire/water damage restoration across four units (#311, 411, 412, 413) in downtown multiple dwelling. Architect-led, no contractor assigned yet, direct-to-inspections approved. $300k value, acute damage timeline. High callback likelihood for interior and window/door replacement work.
We specialize in damage restoration coordination—can expedite your crew scheduling for multi-unit fire/water repairs.
Applicant: Scott Gordon DBA: Scott Gordon Architect
Issued 2026-05-07 · issued 6 days ago · Permit DB-2025-04732 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - Exterior and Interior alterations to provide tenant improvements to this existing community centre building on this site. Interior alterations limited to reconfiguration of the cooking facilities in the existing kitchen space, updated kitchen equipment, new partition wall. Exterior alterations limited to new RTU for installation of new kitchen exhaust fan.
Notes: 1. A special sprinkler inspection may be required if removing, relocating, or deleting any sprinkler heads due to the scope of work. 2. Permit reviewed and approved to VBBL #14343 (2025).
Analyst briefWin likelihood: high
Community centre kitchen renovation ($100k) with architect applicant. New RTU and kitchen exhaust fan specifically called out. Interior kitchen equipment updates align with HVAC scope. Issued May 7, recently pulled—kitchen equipment coordination is key.
Contact to coordinate new kitchen exhaust and RTU installation with updated equipment layout.
Applicant: Alireza Danesh DBA: Danesh Architect Inc.
Issued 2026-05-07 · issued 6 days ago · Permit BP-2026-00882 · Addition / Alteration
Field Review - Addition / Alteration - 2738 E Hastings St
Interior alterations and a change of use from Health Care Office (D) to Financial Institution (D) in this existing commercial building on this site.
Scope of work: Demising and construction of partition walls, new flooring, finishes, ceiling, electrical work to suit.
Ok for Field Review as per J. Kuhleitner
Letter of Assurance: Schedule B (Arch): Jaesung Jung, AIBC, 604.842.6280, jay@jjarch.ca
Note: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector
Analyst briefWin likelihood: high
Contractor D-ONE pulled this $25k alteration for a health-care-to-financial-services conversion. Interior scope includes electrical work alongside partitions and finishes. Field review approved; project is active and sized for electrical scope.
Your electrical crew can handle the tenant fit-out wiring for this retail conversion—D-ONE is the general contractor.
Contractor: D-ONE COMPANY INC. · Applicant: Dashiell Mendez
Issued 2026-05-06 · issued 7 days ago · Permit BP-2026-01198 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to renovate the electrical room on the parking level of this existing hotel building on this site. Scope of work includes installation of new electrical equipment.
Ok for field review per S. Voskakis, April 16, 2026
Schedule A and B Arch provided by Eizaburo Kibayashi, Architect, 778-861-9201, eiza@cloudscape.info Schedule B Struct provided by Brian Seo, Engineer, 778-322-6541, bseo@arcen.ca Schedule B Mech provided by Raymond Cho, Engineer, 778-956-8555, Raymond.Cho@ChorusConsulting.Co Schedule B Elect provided by Jeff Chen, ENgineer, 778-994-8518, jeff.chen@orijinal.ca
Analyst briefWin likelihood: high
Hotel parking-level electrical room renovation ($1.3M) with new equipment install, cleared for field review April 16. RESA Canada contractor, architect and engineers named. Focused electrical scope in occupied building.
Confirm you handle live-building electrical work and can coordinate after-hours installation windows.
Issued 2026-05-06 · issued 7 days ago · Permit DB-2025-03534 · Addition / Alteration
Low Density Housing - Addition / Alteration - Exterior and interior alterations to add a new side bumpout to the main floor, enclose a portion of the rear and add a new rear covered porch to this existing two storey one family dwelling on this inside with lane site.
Structural/Geotechnical Schedule B - Henry S.N Hsu (604)-322-7158
Analyst briefWin likelihood: high
Single-family home addition with side bumpout and rear porch; $600k, issued mid-May with Capilano Builders as contractor. Designer-led project at early stage with structural engineer engaged. Strong fit for major renovation scope with clear scope boundaries and established builder relationship.
Call Capilano Builders to discuss flooring and interior finish coordination for the new bumpout and porch areas.
Issued 2026-05-06 · issued 7 days ago · Permit BP-2026-01406 · Addition / Alteration
Field Review - Addition / Alteration - #960 - 9th floor (expanding into a portion of #950)
Interior alterations to this existing office space on the 9th floor (#960) to exand into a portion of unit #950 in this existing commercial building on this site. Scope of work: remove and construct new demising wall.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: high
Zrtec CM Enterprises holds a $25k permit for a 9th-floor office expansion requiring new demising wall and HVAC modifications. Permit notes HVAC design still needed at building permit stage. Just issued May 6th—they may not have locked in mechanical scope yet.
Call with HVAC design support for the demising—building department flagged envelope and HVAC requirements.
Contractor: Zrtec CM Enterprises · Applicant: Andy Zrno DBA: Zrtec CM Eneterprises Ltd
Issued 2026-05-05 · issued 8 days ago · Permit DB-2026-00272 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - Exterior and interior alterations to provide tenant improvements to this existing Restaurant Class-1 (Group A-2) for a new tenant on the ground floor of this existing Vancouver Heritage Register commercial building on this site.
Exterior alterations include adding two louvers for kitchen exhaust system, one intake louver in the storefront for intake, one exhaust louver facing the rear.
Notes: - Reviewed under the 2025 VBBL. - Class 1 cooking operations (Grease-Laden Vapours). - Commercial kitchen exhaust system to NFPA 96 (Type 1 hood). - Schedule A, B (Architectural, Electrical, Mech/Plumb, Fire Suppression) provided. - Total proposed occupant load is 34. Two washrooms, including one universal washroom are existing. - Signage requires a separate permit.
Analyst briefWin likelihood: med
Cloudscape Architecture pulled permit for ground-floor restaurant tenant improvements in heritage building. Willow Spring Construction handling $500k alteration including kitchen exhaust/intake louvers. Electrical work is subscope of larger reno—good fit for coordinating MEP upgrades in phased commercial tenant fit-out.
Call to confirm electrical scope for new kitchen exhaust system installation and tenant power upgrades.
Contractor: Willow Spring Construction BC Ltd. · Applicant: Eiza Kibayashi DBA: Cloudscape Architecture Inc.
electricalplumbingwindowsflooringnew buildreno major
Issued 2026-05-05 · issued 8 days ago · Permit DB-2025-05257 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - Exterior alterations for roof repair and replacement to this existing multiple dwelling building on this site.
Notes: 1. OK for exterior alteration per P. Sheikhakbari 2. Schedules submitted: A/B(Arch)/D, B (Struct), B(Mech) 3. This permit issued in compliance with VBBL #14343 (2025)
Analyst briefWin likelihood: low
Marine Roofing Repair & Maintenance Service pulled this $417k roof repair and replacement permit on a multi-unit residential building. Issued May 5, structural and mechanical schedules approved. Contractor already engaged—call to discuss scope, timeline, and potential subcontract opportunities.
Confirm if Marine Roofing needs ancillary trades support for this multi-unit exterior work.
Contractor: Marine Roofing Repair & Maintenance Service (2003) Ltd · Applicant: Lucas Capretz DBA: Engineer
Interior alterations to provide tenant improvements to this existing general office on the 2nd floor (#200) of this existing commercial building on site.
Scope of work: Lobby upgrades including removing and replacing existing finishes and ceiling. Demolish 2 existing meeting rooms and electrial work.
Letters of Assurance submitted: \t\t Schedule A and Architectural Schedule B by Hugh Cochlin, Architect, AIBC., 604.879.0118\t\t Electrical Schedule B by Chris Fontaine, P.Eng., 604.298.4858\t\t
Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
Architect-led office tenant improvement on Georgia Street ($114k). Second-floor interior alterations with mechanical scope listed. No general contractor named yet—early permit stage (May 5) offers opportunity to position HVAC before design freeze.
Offer to scope mechanical systems for 2nd-floor office lobby and meeting-room reconfiguration before GC selection.
Applicant: Alissa Foss DBA: Proscenium Architecture & Interiors Inc.
hvacelectricalplumbingflooringdemolitionreno major
Issued 2026-05-05 · issued 8 days ago · Permit BP-2026-00658 · Addition / Alteration
Field Review - Addition / Alteration - #324 – 3rd Level Building 3
Interior alterations to demise unit #324 into two separate office units and to provide tenant improvements at this existing office use on the 3rd floor at this existing commercial building on this site.
Tenant improvements proposed only for Unit #324.
Scope of work: Demising unit #324 into two separate units. Demolition and construction of partition walls, doors and millwork, plumbing, electrical, mechanical and sprinkler work to suit.
Ok for Field Review J. Kuhleitner
Schedule B - ARCH - Danny Wong - 604-773-2068
Analyst briefWin likelihood: high
Danny Wong's architect firm pulled this $100k commercial permit to split one office unit into two with full tenant improvements (electrical, plumbing, mechanical, sprinkler). Field Review stage means design is approved. Strong callable lead: no contractor named, electrical scope is clear, recent issue.
Offer to handle electrical tenant improvements—you can coordinate with the plumbing and mechanical trades on the three-way split.
Applicant: Danny Wong DBA: Architelier Architecture & Real Estate Consulting Inc.
Interior alterations to provide improvements for this existing office tenant on the 5th floor (#550) of this existing commercial building on this site. Scope of work; demo partition walls & t-bar ceiling to create open work space. Electrical, mechanical to suit.
* In accordance with VBBL 2025
* District Building Inspector to determine if a Special Sprinkler Inspection is required.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: low
Pender Street office open-plan conversion ($50k, May 5). Partition and ceiling demo with mechanical to suit. Homeowner-pulled, no GC named. Small value and structural-focused phase; HVAC scope secondary and undefined.
Wait for tenant improvement scope clarification before outreach; current permit is demolition-phase only.
Interior alterations to remove the remainder of the non-load bearing partiton walls on the south half of this vacant full floor office space on the 5th floor (#500) of this existing commercial building.
Scope of work: remove all partitions, doors,ceiling, finishes, except for kitchen millwork, sink , plumbing and storage area to remain as is.
* In accordance with VBBL 2025 * District Building Inspector to determine if a Special Sprinkler Inspection is required. * Separate permit(s) required for future tenant improvements to this space.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
Epic Spaces Inc. pulled a $50k permit for a full-floor office gut renovation on the 5th floor of a downtown Vancouver commercial building. Major interior strip-out including HVAC removal is underway. Fresh permit issued May 5th makes this an early-stage opportunity to bid replacement systems.
Offer HVAC design and installation for vacant office fit-out—you can coordinate with their existing mechanical plans.
Contractor: Epic Spaces Inc · Applicant: Dena Burr DBA: Epic Spaces Inc.
Interior alterations to provide improvements for a new office tenant on the 6th floor (#620) of this existing commercial building on this site.
Scope of work: removal of some partition walls.
* All work in accordance with VBBL 2025 * District Building Inspector to determine if a Special Sprinkler Inspection is required.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: high
Altek Construction Ltd. issued a $15k permit May 5th for 6th-floor office tenant improvement with partition removal. Early-stage field review status and modest budget suggest they're still in design phase and may not have locked HVAC scope.
Mention your experience with quick-turnaround HVAC adjustments for tenant buildouts in mid-rise offices.
Issued 2026-05-05 · issued 8 days ago · Permit BP-2026-00794 · Addition / Alteration
Field Review - Addition / Alteration - #2010 - 20th floor (demising into #2010 & #2030)
Interior alterations to this existing office space on the 20th floor to demise #2010 into two units (to be #2010 and #2030) in this existing commercial building on this site.
Scope of work: remove a door and infill to demise unit into two. No tenant improvement work proposed.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: low
RSP Construction Group Ltd. pulled an $11k permit for a minimal demising alteration—removing one door and infilling to split a single unit into two. No tenant improvement work planned; HVAC involvement is unlikely.
Verify whether the unit split requires any HVAC system reconfiguration or damper work.
Contractor: RSP Construction Group Ltd · Applicant: Robby Pabla DBA: RSP Construction Group Ltd.
Issued 2026-05-05 · issued 8 days ago · Permit BP-2026-01095 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to provide tenant improvements and a change of use from existing retail store to retail limited food in this existing mixed use building on this site.
Scope of work: Millwork cabinetry, shelving, electrical and plumbing work to suite
Ok for Field Review as per J. Kuhleitner
Analyst briefWin likelihood: high
Homeowner Augusto Saavedra pulled this $10k retail-to-food-service conversion. Scope includes electrical and plumbing work alongside millwork. Field review stage indicates active project with straightforward electrical scope.
This food-service fit-out needs electrical work—your team can quote the rewiring for new layout.
Issued 2026-05-04 · issued 9 days ago · Permit BP-2026-01351 · Addition / Alteration
Field Review - Addition / Alteration - #300 - 3rd floor (north half)
Interior alterations to provide improvement to the north half of this existing full floor office tenant space on the 3rd floor (#300) of this existing commercial building on this site.
Scope of work; demolition, construction (walls, doors, millwork), interior finishes, mechanical, electrical, plumbing & life safety.
* In accordance with VBBL 2025
Letters of Assurance submitted; Schedule A and Architectural Schedule B by Andrew Igel, Architect, AIBC. ph#778-839-4260 Electrical Schedule B by Cameron Ballard, P.Eng. Ph#604-347-9722. Mechanical/Plumbing Schedule B by Irsan Tjioe, P.Eng. Ph#778-989-1170
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: high
Fusion Projects (small contractor/applicant) pulled this 3rd-floor office partial-floor reno ($750k) with demo, MEP, and finishes. Issued May 4, work is straightforward and contractor-sized. Good fit for HVAC subcontract.
Contact Fusion Project Management about HVAC for this 3rd-floor office renovation and mechanical rough-in.
Contractor: Fusion Project Management Ltd · Applicant: Jason Ludwig DBA: Fusion Projects
hvacelectricalplumbingflooringpaintdemolitionreno major
Issued 2026-05-04 · issued 9 days ago · Permit BP-2026-00880 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to provide first tenant improvements for a new Health Care Office tenant in this unit #240 on the 2nd floor of this existing mixed-use building on this site.
Sch A & B (Arch): Danny Wong, 604-773-2068, Architelier architecture Sch B (Mech + Plumb): Satwik Shetty, 778-360-1251, Aquavolt Engineering Sch B (Elec): Abdul El-Haddad, 778-360-1251, Aquavolt Engineering
Analyst briefWin likelihood: low
$350k health-care office tenant improvements in mixed-use building. Architect and engineers (mech, plumb, elec) assigned; applicant is Medcorp Construction Inc. Field-review stage. Limited entry unless subcontract roles remain open.
Check with Medcorp if specialized reno or MEP trades are still needed for this health-office fit-out.
Applicant: Gary Chohan DBA: Medcorp Construction Inc
Issued 2026-05-04 · issued 9 days ago · Permit BP-2025-04834 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - Interior alterations to renovate this existing theatre on this site. The scope includes increasing the number of washrooms to better suit the capacity, to improve means of egress including add proper handrails and stair nosings on non conforming stairs, improving non-conforming doors and adding an NFPA 13 compliant sprinkler system.
** This application is reviewed under VBBL 2025**
Building Review Branch Notes: 1)\tTotal proposed occupant load = 350 Persons. 2)\tTotal allow maximum occupant load = 350 Persons. 3)\tA permanent sign indicating the above proposed occupant load shall be posted in a conspicuous location near the suite's principal entrance. 4)\tSchedule A: (David Eaton) AIBC (604.817.9079) 5)\tSchedule B: (David Eaton) AIBC (604.817.9079) Architectural 6)\tSchedule B: (Dave Hans) P.Eng (604.999.2069) Electrical 7)\tSchedule B: (S.K. Sharma) P.Eng (604.999.2069) Plumbing 8) Separate permit will be required for any changes to the interior seating.
NO SOIL DISTURBANCE OR ALTERATION OF GRADES IS TO TAKE PLACE UNDER THIS PERMIT Work under this permit does not authorize excavation, including the disturbance of soils. Should work necessitate excavation or the disturbance of soils, stop work immediately contact the City of Vancouver, and consult an Archaeologist or the Archaeological Branch of British Columbia for the necessary approvals.
Analyst briefWin likelihood: med
David Eaton Architect pulled $290k theatre renovation including washroom additions, egress improvements, and NFPA 13 sprinkler system. Electrical work covers fire suppression wiring and egress lighting upgrades. No contractor named—homeowner/architect-driven project at design stage.
Offer to handle fire suppression panel wiring and emergency egress lighting system design.
Applicant: David Eaton DBA: David Eaton Architect inc
Issued 2026-05-01 · issued 12 days ago · Permit BP-2026-00891 · Addition / Alteration
Field Review - Addition / Alteration - 515 W Hastings
Interior alterations to provide improvements to this existing school-University/College tenant (SFU) on the 2nd floor of this existing Vancouver Heritage Registered B commercial building (Harbour Centre) on this site.
Ok for field review per Jamie Z., March 18, 2026
Schedule A - CRP - Naomi Gross - 604-669-9460 Schedule B - ARCH - Naomi Gross - 604-669-9460 Schedule B - MECH/PLBG - Kai Chen - 604-687-1800 Schedule B - ELEC - Michael O'Keeffe - 604-687-1800
Analyst briefWin likelihood: low
Architect-led interior alteration at SFU tenant space in heritage Harbour Centre. $651k project at field review stage with mechanical and plumbing subscopes assigned. Large institutional anchor tenant suggests solid budget and timeline adherence, though you'll compete against established mechanical/plumbing firms already listed.
Reach out to Kai Chen (mech/plumb lead) to discuss flooring coordination during tenant fit-out phase.
Issued 2026-05-01 · issued 12 days ago · Permit BP-2025-00567 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - BP after DP-2024-00986 & M/A DP-2025-00674
Interior and exterior alterations to this existing Multiple Dwelling building to convert the existing storage, recreation room, and laundry room to two dwelling units and a portion of the existing mechanical room to a new laundry room and to increase the number of units from 8 to 10 rental dwelling units in this existing 4-storey multiple dwelling building. Scope of work includes expansion of existing public corridor into the existing garage leading to exit by replacing an existing garage overhead door with a smaller garage door, infill wall, and an exterior exit door, installation of new footings under the new west unit, reduction of the existing mechanical room, and relocation of the laundry room.
Sch A, Arch B, Struct B, Mech B, Plbg B, Elec B, and Sch D are submitted.
***REVIEWED UNDER VBBL 2019 WITH AMENDMENTS EFFECTIVE ON FEB 28, 2025***
Analyst briefWin likelihood: med
Architect-led conversion of 8-unit building to 10 units with interior/exterior alterations on 4-storey multiple dwelling. Primus Home Inspections listed as contractor but scope suggests need for specialized trades. $309k value, recent issue. Strong residential multifamily play.
We handle major reno coordination for multi-unit conversions—can support your team on the interior/exterior phasing.
Contractor: Primus Home Inspections Ltd. · Applicant: Raul Alcocer DBA: Architect
Issued 2026-04-30 · issued 13 days ago · Permit DB-2025-04799 · Addition / Alteration
Field Review - Addition / Alteration - 2277 McGill St
Exterior alterations to provide residential improvements to this existing multiple dwelling on this site.
Scope of work includes building envelope, replacement of door and window. Slab waterproofing with new landscaping assembly. New flat roof assembly replacement.
Schedule B Arch / Structural: Alfredo Jo - BC Building Science LTD 604-520-6456
Schedule D: Alfredo Jo - BC Building Science LTD 604-520-6456
Schedule A: Alfredo Jo - BC Building Science LTD 604-520-6456
OK for Field Review per DBI Clint C. (November 17, 2025) OK for DB per Sahar H. (November 17, 2025)
This permit was reviewed under VBBL 2019
Analyst briefWin likelihood: med
BC Building Science (applicant Philip Tan) is leading a $1.6M envelope renovation on a multi-dwelling: roof, windows, doors, waterproofing, landscaping. No contractor named yet—project is in field-review stage. Reno scope is strong, but design professional is driving decisions.
Contact the architect directly to position for roof and window replacement on multi-unit residential envelope work.
Issued 2026-04-30 · issued 13 days ago · Permit DB-2025-04895 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - Exterior and interior alterations to renovate this existing mixed-use building on this site.
Scope includes: - Converting Suite #4 to lounge room. - Converting Suite #12 and #28 into amenity space (including lounge, shower rooms and storage). - Converting 2 storage rooms into 2laundry rooms - Adding electrical room and mechanical room on the ground floor - Replacing suite entry doors, flooring, lighting and plumbing fixtures and millwork. - Upgrading fire safety devices for the existing fire alarm system.
The total number of the residential suite will be reduced from 30 to 27.
*** Reviewed under the VBBL 2019 ***
Analyst briefWin likelihood: med
Mixed-use building amenity conversion ($550k)—four suites becoming lounge/showers/laundry, new electrical and mechanical rooms added. Altek Construction, issued April 30. Mid-stage alteration with electrical room buildout.
Call about electrical distribution for new ground-floor rooms and suite rewiring scope.
Contractor: Altek Construction Ltd · Applicant: Mikaila Baird
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-01019 · Addition / Alteration
Field Review - Addition / Alteration - #510 - 5th floor (demise into #510 & #540)
Interior alterations on the 5th floor to demise the existing office #510 into two units to be #510 and #540 and to provide tenant improvements only to suite #510 in this existing commercial building on this site.
Scope of work: Construct a demising wall to create 2 suites, new partitions for new offices, new suite entry doors, flooring, millwork. Electrical, mechanical/plumbing and sprinkler work to suit.
TENANT: HHBG Law Corp
Letters of Assurance submitted: \t\t Schedule A and Architectural Schedule B by Ting Ho Cheung, Architect, AIBC., 604.779.1318\t\t Electrical Schedule B by Roger Dupuis, P.Eng., 604.569.6500\t\t Plumbing/Mechanical Schedule B by Bassam Yammine, P.Eng.,604.609.0500 x107\t\t
Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: med
Downtown commercial demise project splitting one office into two units on the 5th floor of 815 W Hastings. $500k permit issued April 30th to Allspaces Design & Management. HVAC scope includes mechanical rough-in and balance for two separate tenant spaces—mid-size alteration with clear mechanical divisions.
We handle multi-tenant HVAC splits in commercial buildings; interested in coordinating the mechanical zoning?
Contractor: Allspaces Design & Management Ltd · Applicant: Bill Driffield
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-00967 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to provide tenant improvements to the waiting area on the level 1 and level 2 of this existing Hospital- Mental Health Facility (Group B2) building on this site.
OK for field review by Jamie Z., March 24, 2026
Letter of Assurance: Sch A and B (Arch): Knut A. Boeck, AIBC, 604.669.7710 Sch B (Struct): Mark Anderson, P. Eng., 604.688.9861 Sch B (Elec): Gordon Thomson, P. Eng., 604.685.9381 Sch B (Mech & Plbg): Michael A. Oshoway, P. Eng., 604.687.1800
Note: Contractor to have a valid Vancouver Business License or Intermunicipal Business License
Analyst briefWin likelihood: low
$390k hospital interior alterations for waiting-area tenant improvements. Multi-disciplinary team (structural, electrical, mechanical, plumbing engineers named). Institutional project at field-review stage. Low likelihood for independent reno contractor.
Hospital interiors typically pre-assigned to large GCs; check if subcontract subs are still open.
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-00897 · Addition / Alteration
Field Review - Addition / Alteration - Exterior and interior alterations to renovate this existing Single Detached House with Secondary suite.
Exterior alterations are to replace windows and doors.
OK for field review, Jamie Z. March 19, 2025
Letter of Assurance: Sch B (Struct): Ke Jian Ma, APEGBC, 778 877 9016
NOTE: (1) Contractor to have a valid Vancouver Business License or Intermunicipal Business License
Analyst briefWin likelihood: high
Homeowner-pulled (Dynamic Space Inc. applicant) single-detached renovation with secondary suite. Exterior window/door replacement plus interior work, field-review approved. $271k value, recent issue, no contractor assigned. Clean scope match for your trade.
We can manage permitting handoff for your window and door install on this secondary-suite reno.
Interior alterations to the existing offices on the 4th floor to demolish demising walls and partition walls to combine units #428, #440 & #450 into one unit (retaining #440) in this existing commercial building on site.
Scope of work: demo of demising walls, partition walls, doors/frames, millwork, finishes to shell. Plumbing to suit.
Separate Permit(s) required for future tenant improvement to this space.
Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required.
* All work in accordance with VBBL 2025.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: low
Office consolidation on Cambie Street ($70k, issued April 30). Demising wall demolition and shell prep for future TI. HVAC listed but noted as 'to suit'—current phase is structural only. Lower priority until tenant improvement permit pulled.
Follow up when tenant improvement permit is filed to bid mechanical systems for final fit-out.
Applicant: Nazima (Afimiwalla) Sanghadia
hvacelectricalplumbingframingflooringdemolitionreno major
Issued 2026-04-30 · issued 13 days ago · Permit DB-2026-00729 · Addition / Alteration
High Density Housing / Commercial - Addition / Alteration - Exterior alterations to the east and north façade of existing one-storey mixed-use commercial building on this site.
Notes: 1. Exterior work only. 2. No interior or electrical work proposed. 3. Building envelope professional: Julien Leger, AIBC at 604.416.2133. 4. Permit reviewed and approved to VBBL #14343 (2025).
Analyst briefWin likelihood: low
Architect Julien Leger pulled this permit for exterior-only facade work on a mixed-use commercial building. Permit explicitly excludes interior and electrical work, so no scope for electrical trades despite the tag.
Not a fit—permit notes no electrical work proposed.
Applicant: Julien Leger DBA: Francl Architecture Inc.
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-01341 · Addition / Alteration
Field Review - Addition / Alteration - 13th and 14th floor
Interior alterations to provide improvements for this existing full floor office tenant on the 13th and 14th floors of this existing commercial building on this site.
Scope of work: Install one glass door on the 13th floor and two glass doors on the 14th floor to separate the Elevator lobbies from open work station areas.
* All work in accordance with VBBL 2025 * District Building Inspector to determine if a Special Sprinkler Inspection is required.
Letters of Assurance submitted; - Architectural Schedule B by Tony Gill, Architect, AIBC. ph#604-377-2477.
Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Analyst briefWin likelihood: low
Gibraltar Holdings Ltd. pulled a $25k permit for glass door installation across 13th and 14th floors of an existing office tower. Low-scope partition work suggests minimal HVAC involvement unless ceiling/distribution changes are planned downstream.
Check if door installation triggers any HVAC damper or zoning adjustments on their floors.
Contractor: Gibraltar Holdings Ltd · Applicant: tony Gill
Field Review - Addition / Alteration - Interior alterations to provide tenant improvements to this existing Fitness Centre. The scope includes to upgrade all existing lighting to new LED, select new finishes (paint, new flooring) and demise one shower into 2 toilet rooms.
OK for field review per DBI
Contractor: VPAC Construction Group Ltd · Applicant: Ehsan Vali DBA: ValiDesign
High Density Housing / Commercial - Addition / Alteration - Interior alterations for an elevator modernization and fire alarm upgrade to meet the CSA B44-16 requirements to this existing 5-storey mixed-use commercial building.
Notes: 1. Main recall level: Main/Ground Floor 2. Alternate recall level: 2nd Floor 3. Permit reviewed and approved to VBBL #14343 (2025.)
Issued 2026-05-11 · issued 2 days ago · Permit BP-2026-01467 · Addition / Alteration
Direct to Inspections - Addition / Alteration - #811 - 1450 PENNYFARTHING DR.
Interior alterations to provide residential improvement to an existing dwelling unit at #811 - 1450 PENNYFARTHING DR. on the seventh and eighth floor of this existing multiple dwelling building on the site.
Issued 2026-05-11 · issued 2 days ago · Permit DB-2026-00268 · Addition / Alteration
Low Density Housing - Addition / Alteration - Exterior and interior alterations to remove the rear deck cover, storage area under the rear deck, add a porch at the front, and add/ remove interior walls on the lower floor for this existing non conforming single detached house on this inside with lane site.
Issued 2026-05-11 · issued 2 days ago · Permit BP-2026-01461 · Addition / Alteration
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvements to this existing 4 unit MCD building on this site.
Scope of work: Localized installation of waterproof membrane on the basement wall in Unit C & D, updating insulation and drainage.
Ok for DTI as per DBI J. Steen
Applicant: Fred De Barros DBA: SAF Consulting Group
Issued 2026-05-11 · issued 2 days ago · Permit BP-2026-01267 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to install glass walls and doors for security around the convenience stairs on level 30, 31 and 33 of this existing office space in this existing commercial building on this site.
Issued 2026-05-11 · issued 2 days ago · Permit BP-2026-01348 · Addition / Alteration
Direct to Inspections - Addition / Alteration - #1202-1330 Harwood St Interior alterations to provide residential improvements to #1202 on 12th Floor in this existing multiple dwelling on site.
Scope of work includes renovation to replacing flooring, tile, millwork, plumbing fixtures in Bathroom and Kitchen.
Issued 2026-05-11 · issued 2 days ago · Permit BP-2026-01155 · Addition / Alteration
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvement to an existing dwelling unit at #PH13 - 1717 Bayshore Dr. on this existing multiple dwelling building on the site.
Issued 2026-05-08 · issued 5 days ago · Permit BP-2026-01375 · Addition / Alteration
Field Review - Addition / Alteration - 2337 MAIN ST
Interior alterations at 2337 MAIN ST to provide tenant improvements and change of use and major occupancy from this existing Retail Store (Group E) to Health Care Office (Group D) for a new tenant at 2337 Main Street on the ground floor of this existing commercial building on this site.
Okay for Field Review as per I.Celic April 24, 2026
Contractor: QKD Construction Ltd · Applicant: Jason Cho
Issued 2026-05-08 · issued 5 days ago · Permit BP-2026-01382 · Addition / Alteration
Direct to Inspections - Addition / Alteration - Exterior alterations only to install 21 flush mounted solar panels on the sloped roof of the accessory building of this single detached house on this site.
Applicant: Penfolds Roofing and Solar DBA: Penfolds Roofing and Solar
Issued 2026-05-08 · issued 5 days ago · Permit BP-2026-01196 · Addition / Alteration
Field Review - Addition / Alteration - 2827 Arbutus St.
Interior alterations to provide tenant improvements and a change of use/occupancy from Retail to Animal service with Ancillary Retail. (approx. 1299.2 sf) at 2827 Arbutus St. on the 1st floor of this existing commercial building on this site.
Okay for Field Review as per Allyson B. - April 13th, 2026
Submission under VBBL 2025
Contractor: FY Four Seasons Construction Ltd · Applicant: Lisa Chiu
Issued 2026-05-07 · issued 6 days ago · Permit DB-2025-02342 · New Building
Low Density Housing - New Building - To construct a 1 storey laneway house building ($100,000) with 1 open parking pad having vehicular access from the 20' Lane.
Note: The entire building to be sprinklered to NFPA 13D Associated with 3 Case Files: CF-2024-00152, CF-2023-01279 & CF-2026-000055
Note: This is a 1 storey building pursuant to the Zoning & Development By-law.
1.\tCovenant not required with existing house 2.\tNo Strata Titling permitted 3.\tHRV proposed – Located in dining room closet 4.\tSchedule B: (J.Peng) P.Eng (778.998.0616) Structural 5.\tHPO: Residential Builder- Laneside Homes Ltd
NOTE: To achieve the required FSR. A floor space exclusion of 2% has been applied to this application as per section 10.15.1 of the Zoning-Bylaw, to accommodate improved building performance.
Address Information:
Building 2 #3-4784 Ross St - Laneway House (1.0 storey)
Note: As a result of the addition of a laneway house, the main house / principal dwelling will be assigned a suite number and the site will be as follows: #1-4784 Ross St - Principal Dwelling #3-4784 Ross St - Laneway House
Address and suite numbers assigned as per approved plans for Fire and Emergency response. The address number is to be posted on the building to be visible from the street and the suite numbers are to be posted at the suite entries in accordance with the Building By-law prior to final inspection.
NOTE: Information regarding the principal building on the survey and site plan is for reference only. Any discrepancy between information regarding the principal building on the survey and/or site plan and approved permit drawings for the principal building are neither approved nor authorized under this laneway house permit.
Note: Bldg 1 (principal bldg) addressed #1-4784 Ross St retained on site.
***This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Contractor: Laneside Homes Ltd · Applicant: Jason Hyare DBA: Laneside Homes Ltd
Issued 2026-05-07 · issued 6 days ago · Permit BP-2025-04840 · Addition / Alteration
Enquiry Centre - Addition / Alteration - 220 E 54th AV
To construct a detached 22’ x 23’5” accessory building (garage) at the rear of this single family dwelling site to provide 2 parking spaces having vehicular access from the side lane.
Issued 2026-05-07 · issued 6 days ago · Permit DB-2026-00851 · Addition / Alteration
Field Review - Addition / Alteration - 228 E 63rd
Exterior and interior alterations to provide improvements to this existing single detached house with secondary suite on this site.
Scope of work: Validation of 184 sqft balcony enclosure on the upper floor (approved by BOV Appeal No. Z36275); Removal of unauthorized porch on the main floor and aluminum cover on the second floor.
Related to CF-2023-012996.
Separate permit required for the solar panels.
TREE BARRIER REQUIRED ONLY FOR THE CITY TREE, PER M. NICHOLSON.
OK for field review per O. Luo, March 12th, 2026
Schedule B - ARCH/STRUC - Xue Li Chen - 778-235-5447
Issued 2026-05-07 · issued 6 days ago · Permit BP-2026-00889 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to change the use from Storage Warehouse with ancillary office to Vehicle Repair with Storage in this existing #105 in this existing commercial building on this site.
the scope includes to validate the washroom on the 2nd floor and adding new walls and doors
Ok for Field Review as per Jamie Zhang, March 18, 2026
Schedule B Mech and Plumb provided by Yan Ma, Engineer, 604-375-9066, yan@accuplaneng,com
Issued 2026-05-06 · issued 7 days ago · Permit BP-2026-01089 · Addition / Alteration
Field Review - Addition / Alteration - #807 - 815 HORNBY ST
Interior alterations and a change of use / Occupancy from Office (Group D) to Retail Store (Group E) and to provide improvements for a new Retail tenant at #807 - 815 HORNBY ST on the ground floor of this existing commercial building on this site.
OK for Field Review per Ankur H, April 1, 2026
Scope of work: Remove existing interior partition walls Add new partition walls, mill work.
Applicant: Muhammed Nazeer Bawa / Ewan Construction DBA: EWAN
Issued 2026-05-05 · issued 8 days ago · Permit BP-2026-00734 · Addition / Alteration
Field Review - Addition / Alteration - #490-9123 Bentley St
Interior alterations to provide first tenant improvements and a change of use/occupancy of approx. 2100 SF to this existing Office - Shell (Group D) tenant, for a new for a new Artist Studio-Class A (Group F2) at #490-9123 Bentley Street on the 4th floor of this existing mixed-use building on this site.
Okay for Field Review as per Jamie Steen March 4, 2026
Schedule A provided by Richard Kadulski, Architect AIBC | Richard Kadulski Architect | 604-689-1841
Schedule B (Architectural) provided by Richard Kadulski, Architect AIBC | Richard Kadulski Architect | 604-689-1841
Schedule B (Mechanical/Plumbing) provided by Satwinder Pal Singh, P.Eng | TAG Engineering Inc | 604-564-6800
Issued 2026-05-05 · issued 8 days ago · Permit BP-2026-01433 · Addition / Alteration
Direct to Inspections - Addition / Alteration - #103 - 2469 CORNWALL AV. Interior alterations to provide residential improvement to an existing dwelling unit at #103 - 2469 CORNWALL AV. on the first floor of this existing multiple dwelling building on the site.
Okay for DTI per A. Best April 30, 2026
Contractor: NorthX Build Group Ltd · Applicant: Ishar Basraon
Issued 2026-05-05 · issued 8 days ago · Permit BP-2026-01001 · Addition / Alteration
Field Review - Addition / Alteration - #12 - 555 W 12th Av Interior alterations to provide improvements for a new Health Care Office tenant at unit #12 in this existing Municipally Designated Heritage commercial building.
OK for field review as per Eun Jeon.
Notes: 1. Refer to DP-2026-00227 for change of use from Retail Store to Health Care Office. 2. No beauty services are permitted including facial treatments, skin care treatments, moxibustion therapy, massage and herbal soak therapy. 3. Services offered by this business (Acupuncture and Cupping) are restricted activities that are regulated under the Health Professions Act. Only registrants of the College of Complementary Health Professions of BC are permitted to offer such services to the public. 4. If there are changes to the operation including additional service(s), a Minor Amendment or a new Development Permit may be required.
Issued 2026-05-05 · issued 8 days ago · Permit DB-2026-01018 · Addition / Alteration
Field Review - Addition / Alteration - Exterior and interior alterations to change the use from Single Detached House to Single Detached House with Secondary Suite and add a 12'-4"x7'-3" rear covered deck.
#1-4535 Reid St - Principal Dwelling (1st-2nd floors) #2-4535 Reid St - Secondary Suite (basement)
Related to CF-2024-000084
Schedule B (Struct & Geotech): Shambhu N Biswas, P Eng., 604.250.8666
Note: Contractor to have a valid Vancouver Business License or Intermunicipal Business License
Issued 2026-05-05 · issued 8 days ago · Permit BP-2026-00337 · Addition / Alteration
Field Review - Addition / Alteration - 676 W 50th Ave
As per Board of Variance appeal number Z36080, dated April 15, 2025 for exterior alterations to permit the addition of an aluminum cover (approx. 24'0" by 27'0") over the upper floor roof-deck at this existing single detached house with secondary suite in the cellar and with a detached accessory building (garage) at the rear, providing four (4) parking spaces having vehicular access from the lane, and subject to the following conditions:
(1) that this upper floor, roof-deck cover has been approved with an exclusive use clause and ONLY for the current Owners - 'Baljit Kaur Sandhu and her family members'. And if the current Owners (Baljit Kaur Sandhu) sell the property, then they "must remove" this roof deck cover addition and all at the owners' expense; and
(2) that the development shall otherwise comply with the requirements and regulations of the Zoning and Development By-law to the satisfaction of the Director of Planning.
Note: On April 15, 2026, the Board of Variance reviewed and updated the board's April 2025 decision and granted an extension of the boards decision to obtain City Permits by October 15, 2026.
Schedule B Structural: Harinder Saini - ASEM Engineering LTD 604-614-9959
Issued 2026-05-04 · issued 9 days ago · Permit BP-2026-00730 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to provide residential improvements from fire and water damage to common hallways and multiple units on multiple floors of this existing multiple dwelling building on this site.
4th Floor – Unit 409 5th Floor – Unit 509 & 508 6th Floor – Unit 609
Scope of work: Replacement of interior finishes (walls, flooring, ceiling) due to fire and water damage
Issued 2026-05-04 · issued 9 days ago · Permit DB-2026-01283 · Addition / Alteration
Field Review - Addition / Alteration - 1010 CANADA PLACE
Interior alterations to expand 1010 CANADA PLACE into a portion of the ancillary offices to the existing hotel at 1038 CANADA PLACE and provide tenant improvements to an existing Retail (Group E) store - approx. 3234 sq ft., for a new retail tenant on the ground floor of this existing mixed-use building on this site.
Okay for Field Review as per Dave H. April 20, 2026
Notes: 1. A sprinkler permit may be required based on field review site observations. 2. Contractor required a valid City of Vancouver Business Licence or IMBL
Issued 2026-05-04 · issued 9 days ago · Permit BP-2026-01276 · Addition / Alteration
Field Review - Addition / Alteration - 3166 E 5TH AVE
Exterior and interior alterations to provide residential improvements to this existing single family with secondary suite dwelling on this site.
Scope of work: Exterior scope of work limited to validating the extension of existing landing into an uncovered deck and removal of existing cover over deck. Interior alterations limited to main floor kitchen area, removal of wall and reconfiguring kitchen layout.
Ok for Field Review as per J. Kuhleitner
Letters pf Assurance: Schedule B - Structural: Jie Peng (778)998-0616
Notes: 1.Contractor requires a valid City of Vancouver Business Licence or IMBL. 2. Any changes to existing sprinkler system will require a separate sprinkler permit.
Issued 2026-05-04 · issued 9 days ago · Permit BP-2026-01332 · Addition / Alteration
Direct to Inspections - Addition / Alteration - unit#150 Interior alterations to remove non-structural materials (interior demo). Note: Separate permit for the interior renovation work.
Ok for DTI as per D. Jung April 23, 2026
Contractor: MARANELLO DEVELOPMENTS INC. · Applicant: Siukee Wong DBA: ICON WEST CONSTRUCTION
Issued 2026-05-04 · issued 9 days ago · Permit BP-2026-01209 · Addition / Alteration
Field Review - Addition / Alteration - Levels 3, 4 & 5 - 1200 W 73rd Avenue
Interior alterations to provide tenant improvements on levels 3, 4 and 5 at 1200 W 73rd Avenue of this existing commercial building on this site.
Scope of work includes: updating the existing demising walls on the 3, 4 and 5th levels to full height underside of slab walls with a 1 hr fire rating and to validate the combining of units #300 and #360 on level three
Okay for Field Review as per J.Steen April 15, 2026
Schedule A provided by Vipul Chauhan | Contoura Architecture LTD. | 778-657-6188 Schedule B (Architectural) provided by Vipul Chauhan | Contoura Architecture LTD. | 778-657-6188 Schedule B (Fire Suppression Systems) provided by Xiangyang Tan, P.Eng | XT Engineering LTD. | 778-706-5858 Schedule B (Struct) provided by Simon Shen, Engineer, 604-771-0116, sshen@continuitystruct.com
NO SOIL DISTURBANCE OR ALTERATION OF GRADES IS TO TAKE PLACE UNDER THIS PERMIT. Work under this permit does not authorize excavation, including the disturbance of soils. Should work necessitate excavation or the disturbance of soils, stop work immediately contact the City of Vancouver, and consult an Archaeologist or the Archaeological Branch of British Columbia for the necessary approvals.
Issued 2026-05-01 · issued 12 days ago · Permit DB-2026-00571 · Addition / Alteration
Field Review - Addition / Alteration - 328 E 65th
Exterior and interior alterations to provide residential improvements and change of use from this existing single detached house to a single detached house with secondary suite building on this site.
Scope of work includes removing unpermitted deck on the upper floor, validating enclosure of carport, re-insulating the roof, and creating a secondary suite on the main floor
Issued 2026-05-01 · issued 12 days ago · Permit DB-2026-00712 · Addition / Alteration
Field Review - Addition / Alteration - 4033 W 41 Avenue
Change of use from the existing single detached house to a single detached house with a secondary suite building on this inside with lane site.
Scope of work includes validating secondary suite in the basement floor only.
Okay for field review as per J.Ly
Related to: IA-2025-00272 Case File CF-2025-005949 Case File CF-2025-012474
Contractor to have a valid Vancouver Business License or Intermunicipal Business License
This permit is for alterations to improve the secondary suite and basement area only. Any unauthorized work on this site, existing or otherwise, is neither recognized nor approved and may be subject to enforcement action.
Issued 2026-05-01 · issued 12 days ago · Permit DB-2026-00543 · Addition / Alteration
Low Density Housing - Addition / Alteration - Exterior and interior alterations to add a dormer and bathroom on the attic floor at this existing non-conforming single detached house with secondary suite on this inside with lane site.
This building is sprinklered.
Schedule B, Structural, Clinton Yiu, Struct Eng, 604-255-7670.
This permit is for alterations as shown in plans only. Any unauthorized work on this site, existing or otherwise, is neither recognized nor approved and may be subject to enforcement action.
Contractor: Milan Frko · Applicant: Carman Kwan DBA: Architectural Collective Inc.
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-01346 · Addition / Alteration
Direct to Inspections - Addition / Alteration - Interior alterations to provide residential improvement to an existing dwelling unit at #101 - 1130 W 13TH AV. on the first floor of this existing multiple dwelling building on the site.
Okay for DTI per A. Best April 23, 2026
Contractor: Davinder Gaday dba Mundial Enterprises · Applicant: Dave Gaday DBA: Mundial enterprises
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-00817 · Addition / Alteration
Field Review - Addition / Alteration - #16th Floor - 1111 W Georgia St
Interior alterations to demise this existing office space into two units and provide tenant improvements to one of the newly created units on the 16th floor of this existing commercial building on this site.
Schedule A provided by Koosha Kheradmandnia, Engineer, 778-979-7100, info@arvandengineering.com Schedule B Arch provided by Zahra Mizazadeh, Engineer, 778-979-7100, zahra,m@arvandengineering.com Schedule B Mech, Plumb, and Elect provided by Farzad Hemmati, Engineer, 604-649-4574, FarzadH@bmactc.com
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-01216 · Addition / Alteration
Field Review - Addition / Alteration - #201 - 1584 W 12TH AV
Interior alterations to provide improvements to suite #201 - 1584 W 12TH AV on the 3rd and 4th floor of this existing multiple dwelling building on this site.
Scope of work to include removal of unapproved roof deck cover, guardrails, and over height fencing on the 4th floor.
OK for Field Review as per Ankur H, 14 April 2026
Letters of Assurance: Schedule B - Arch: W. NEIL ROBERTSON (604)688-5585
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-01158 · Addition / Alteration
Direct to Inspections - Addition / Alteration - 368 E 6th Avenue Temporary shoring to provide residential improvements to this existing single detached house on this site.
Scope of work includes temporary shoring on the ground floor only.
OK for DTI per M. Lee with I. Mackie (26.03.04)
Schedule B (Structural) provided by Cavvy Structural Engineering- David Mark James Budd, P.Eng. ph#: 604-294-1931
Issued 2026-04-30 · issued 13 days ago · Permit BP-2026-01199 · Addition / Alteration
Field Review - Addition / Alteration - Interior alterations to install a demising wall for unit #430 on the 4th floor of this existing Office space on the 4th floor of this existing commercial building on this site.
Note: Contractor to have a valid Vancouver Business License or Intermunicipal Business License
Issued 2026-04-29 · issued 14 days ago · Permit BP-2026-00655 · Addition / Alteration
Field Review - Addition / Alteration - 9149 Hudson St
Interior alterations only to provide two new catwalks including new steel columns and footings for bay #10 and #12 in this existing public authority use (transit facility) building.
OK for field review per Jame Z. Feb 26, 2026
Letter of Assurance: Sch A & Sch B (Struct): Dennis Xi Cheng, P. Eng. - 604.293.1441, chengd@ae.ca Sch B (Mech & Plbg): Zvjezdan (Dan) Vujicic, P. Eng - 604.293.1441 - vujicicd@ae.ca Sch B (Elec): Derek R.A. Desaulniers, P. Eng. - 604.293.1441, desaulniersd@ae.ca
Note: (1) Contractor to have a valid Vancouver Business License or Intermunicipal Business Licence
(2) Work under this permit does not authorize excavation beyond the existing slab, including the disturbance of soils. Should work necessitate excavation or the disturbance of soils, stop work immediately contact the City of Vancouver, and consult an Archaeologist or the Archaeological Branch of British Columbia for the necessary approvals.
Issued 2026-04-29 · issued 14 days ago · Permit DB-2026-00187 · Addition / Alteration
Certified Professional Program - Addition / Alteration - #3210 (Delysées Desserts)
First Tenant Improvement and Change of Use and Major Occupancy from Retail shell (Group E) to Restaurant - Class 1 (Group A2) for this tenant on the ground floor of the Oakridge Mall.
***Reviewed under the VBBL 2025***
Stage 1 - Full Construction Tenant Improvement (First TI) issued on April 29, 2026.
Applicant: David Steer DBA: LMDG Building Code Consultants Ltd.
Issued 2026-04-29 · issued 14 days ago · Permit DB-2026-00782 · Addition / Alteration
Field Review - Addition / Alteration - 3525 E Hastings
Interior alterations to change the use from Retail (Group E) to Fitness Centre (low occupancy A2 - Group D) in this unit on the ground floor of this existing mixed-use building on this site.
Ok for field review per Jamie Z., March 10, 2026
Tenant: "Fit Body By George"
DBI to determine if Schedule B is required for architect on site.
Issued 2026-04-29 · issued 14 days ago · Permit BP-2026-01408 · Addition / Alteration
Low Density Housing - Addition / Alteration - Exterior alterations to this existing One Family Dwelling (principal dwelling building) on this inside with lane site. Scope to include: Removing the existing deck cover to achieve min. 16.08' separation between principal dwelling and the new laneway house. NOTE: The principal dwelling exterior deck cover removal work to be completed prior to the Final inspection of the related Laneway House.
Contractor: Skymark Engineering Ltd · Applicant: Wayne Ng DBA: Skymark Engineering Ltd